Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Post Mounted Luminaires AFL100 series Do not open during installation This product is factory-sealed. Refer to the instructions contained in this document for details. Surge Protection This product features built-in surge protection circuitry in compliance with applicable standards.
Post Mounted Luminaires AFL110 ø 89 ø 89 191.5 AFL120 ø 89 ø 89 191.5 AFL130 ø 89 ø 89 191.5 IP66. IK08. Class I, II. T a see table in on page 5 ø 9 – 14 mm 1 = 2.5 mm Tool required Mounting height 3 –...
Weight Windage area for AFL110 max. 4.70 for AFL110 max. 0.092 for AFL120 max. 6.95 for AFL120 max. 0.146 for AFL130 max. 8.60 for AFL130 max. 0.191 Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners.
Page 4
Post top and Side entry Attachment M can be mounted vertically or horizontally. To change position loosen fasteners J, rotate by 180° and refasten. For vertical mounting, attachment can be set at 0° or 2.5° by loosening screws J. For horizontal mounting, attachment can be set at 0°, 2.5°, 5°, 7.5°, 10°, 12.5°, and 15°.
Installation Procedure 1) Switch off mains electrical supply. 2) Pull the connecting cable through the pole. Place the luminaire on top of the pole and tighten fasteners B, tightening to a torque of 10 Nm. ø 40-60 x 100* ø 76 x 100 Side entry Post top * ø...
Page 6
3) Trim mains cable E to the desired length and connect the leads to their respective terminals at the base of the pole: a) ON/OFF (L = Phase, N = Neutral, = Earthing) b) BASIC (L1 = Phase 1, L2 = Phase 2,N = Neutral, = Earthing) c) DALI (L = Phase, N = Neutral, = Earthing, DA/DA = DALI control line) 4) Table of maximum temperature AFL110, AFL120 and AFL130.