Download Print this page
WE-EF AFL100 Series Installation And Maintenance Instructions Manual

WE-EF AFL100 Series Installation And Maintenance Instructions Manual

Post mounted luminaires

Advertisement

Quick Links

WE-EF LEUCHTEN
Installation and Maintenance
Instructions
Post Mounted Luminaires
AFL100 series
Do not open during installation
This product is factory-sealed.
Refer to the instructions contained in this document for details.
Surge Protection
This product features built-in surge protection circuitry in compliance
with applicable standards.
For comprehensive protection of a luminaire installation against lightning
and electrical surges, it is essential to cover mains supply and data input
lines at the distribution board level, by using respective primary (Type 1)
and secondary (Type 2) surge arrestors in compliance with EN61643-11/
IEC61643-1.
Warning
Ensure that all required surge protection measures are in place and
activated prior to luminaire installation. Also, disconnect luminaires
before operating high-power devices such as, for example, electrical
arc welders.

Advertisement

loading

Summary of Contents for WE-EF AFL100 Series

  • Page 1 WE-EF LEUCHTEN Installation and Maintenance Instructions Post Mounted Luminaires AFL100 series Do not open during installation This product is factory-sealed. Refer to the instructions contained in this document for details. Surge Protection This product features built-in surge protection circuitry in compliance with applicable standards.
  • Page 2: Mounting Height

    Post Mounted Luminaires AFL110 ø 89 ø 89 191.5 AFL120 ø 89 ø 89 191.5 AFL130 ø 89 ø 89 191.5 IP66. IK08. Class I, II. T a see table in on page 5 ø 9 – 14 mm 1 = 2.5 mm Tool required Mounting height 3 –...
  • Page 3: Maintenance

    Weight Windage area for AFL110 max. 4.70 for AFL110 max. 0.092 for AFL120 max. 6.95 for AFL120 max. 0.146 for AFL130 max. 8.60 for AFL130 max. 0.191 Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners.
  • Page 4 Post top and Side entry Attachment M can be mounted vertically or horizontally. To change position loosen fasteners J, rotate by 180° and refasten. For vertical mounting, attachment can be set at 0° or 2.5° by loosening screws J. For horizontal mounting, attachment can be set at 0°, 2.5°, 5°, 7.5°, 10°, 12.5°, and 15°.
  • Page 5: Installation Procedure

    Installation Procedure 1) Switch off mains electrical supply. 2) Pull the connecting cable through the pole. Place the luminaire on top of the pole and tighten fasteners B, tightening to a torque of 10 Nm. ø 40-60 x 100* ø 76 x 100 Side entry Post top * ø...
  • Page 6 3) Trim mains cable E to the desired length and connect the leads to their respective terminals at the base of the pole: a) ON/OFF (L = Phase, N = Neutral, = Earthing) b) BASIC (L1 = Phase 1, L2 = Phase 2,N = Neutral, = Earthing) c) DALI (L = Phase, N = Neutral, = Earthing, DA/DA = DALI control line) 4) Table of maximum temperature AFL110, AFL120 and AFL130.
  • Page 7 WE-EF LIGHTING Switzerland United States of America Tel +41 22 752 49 94 Tel +1 724 742 0030 Fax +41 22 752 49 74 Fax +1 724 742 0035 info.switzerland@we-ef.com info.usa@we-ef.com TO9280W0923 © WE-EF 2023 Technical specifications are subject to change.

This manual is also suitable for:

Afl110Afl120Afl130