Download Print this page

Required Tools And Materials - Elkay SOFT SIDES EDFPBM117WS Installation, Care & Use Manual

Fountains with flexi-guard and ezh2o bottle filler

Advertisement

TO BUBBLER
12
13
12
14
TO BOTTLE
FILLER
32
WATER
INLET
Figure 2 - EZWS-EDFPBM117K Tube Routing
TO BUBBLER
13
12
32
24
TO BOTTLE
FILLER
21
FILTER
ASSEMBLY
Figure 3 - LZWS-EDFPBM117K Tube Routing
EDFPBM117WS
TO BUBBLER
12
25
26
TO BUBBLER
12
12
WATER
INLET
EDFPBM117WS-F

REQUIRED TOOLS AND MATERIALS

These tables show special tools and/or additional materials
(not provided) which are necessary to complete installation
of these units:
Special Tools
Description
Item
Additional Materials Not Included
Item
Description
1
Unplated copper inlet pipe
2
Service Stop/Shut-off Valve
3
90° 1-1/4" Drain Line
4
1-1/4" Tee Drain Line
1. Make water supply connections (Fig 11). Install a shut-off
valve and union connection to building water supply (valve
and union not provided). Turn on water supply and flush
the line thoroughly.
Caution: DO NOT SOLDER tubes inserted into the
strainer or filter head as damage to the o-rings may result.
2. Install mounting frame (instructions supplied with mounting
frame.
3. (For LZWS-EDFPBM117K) Install the filter head to the bracket,
then install filter bracket on mounting frame (Fig 10), plumb from
the filter outlet to the chiller inlet with ¼" elbow, poly tubing and
¼ x ¼ union, install filter.
3a. (For EZWS-EDFPBM117K) Install strainer on the input tube to
the chiller (Fig 2).
4. Install ¼ x ¼ x 3/8 Tee on building water supply tube. Install
supplied 4" poly tubing and armaflex to the outlet of the prev-
ously installed tee. Connect supplied ¼ x ¼ x ¼ tee to the 4" poly
tubing. With the back panel standing close to the frame, connect
3/8" poly tube to the bottle filler.
5. Hang main panel on mounting frame hanger. Make sure the
power cord, reset switch wire & poly tube do not get pinched
between the panel & mounting frame. Ensure the panel engages
at the top. Align fountain holes with mounting frame holes.
6. Remove protective coating from main panel.
7. Install fountains with (8) 5/16-18 HHMS, (8) 5/16-18 nuts &
(4) support brackets (provided) (Fig 5). Connect the ¼" water
lines from each fountain to the remaining openings on the tee
at the remote chiller (cut lines to fit as needed), (Test fit refrig-
erated panel to make sure there is a tight joint between it & the
main panel before fully tightening mounting screws.)
Page 3
Quantity
NONE
Quantity
1
1
1
1
0000001029 (Rev. E - 06/16)

Advertisement

loading