Install and leak check
1. Mount the Midas S2 using the integral mounting bracket.
2. Connect the actual inlet & outlet tubes to Midas S2 and turn on
the system.
Verify the Check-Valve is attached to the Sampled Point.
After the Power ON, wait approximately 10 minutes for pump
stabilization and corrective measures.
3. Perform a Block test to ensure internal connections are secure.
Refer to Block test in the Midas S2 User Manual for further
information.
Operation
Select MENU > TEST MODE > LIT and follow the instructions for LIT
enable, Setting, Calibration, and Manual test.
Please secure the calibration procedure for the accurate operation of LIT.
18