Commissioning; General; Safety Check; Functional Test - HADEF 320/01 Installation, Operating And Maintenance Instructions For The Installer And The User

Wall-mounted jib crane
Table of Contents

Advertisement

8

Commissioning

8.1

General

Should the unit be used in Germany:
Please observe the validated, national accident prevention regulations.
For other countries:
Inspections as above. Please observe the national rules and regulations and the instructions in this manual!
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a "qualified
person" before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley
movement, must be tested by a "licensed qualified person" before putting in operation.
An exception is "hoists ready for operation" acc. validated national regulations with EU-declaration of
conformity.
Definition "qualified person" (former expert)
A "qualified person" has learned, due to occupational training and experience and the job that the person has
done, the skills needed to tests the material for one's work.
Definition "licensed qualified person" (former approved expert)
A "licensed qualified person" has, due through special occupational training, knowledge about testing of the
material for one's work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test the material for one's work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
9

Safety check

Before putting into service initially or when putting back into service, it must be checked whether:
All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured.
10

Functional test

10.1

Checks before initial start-up

Design
Check all screws and safety connections.
10.2
Functional test
Function – crane slewing unit
Correct slewing of crane jib
Correct position of end stops
5.52.732.00.01.05
9

Advertisement

Table of Contents
loading

Table of Contents