Maintenance; General; Monitoring - HADEF 320/01 Installation, Operating And Maintenance Instructions For The Installer And The User

Wall-mounted jib crane
Table of Contents

Advertisement

11

Maintenance

11.1

General

All monitoring, servicing and maintenance operations are to ensure correct functioning of the equipment;
they must be effected with utmost care.
Only "qualified persons" may do this work.
Servicing and maintenance work must only be done when the hoist is not loaded.
Records must be kept of all test results and measures taken.
11.2

Monitoring

The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift
operation. In case of severe operating conditions (e.g. frequent operation with full load) or special
environmental conditions (e.g., heat, dust, etc.), the intervals must be shortened correspondingly.
12
Inspection
12.1
Periodic checks
Independently from the regulations of the individual countries, lifting devices must be checked at least yearly
by a qualified person or licensed qualified person regarding its functional safety.
12.2
Inspection intervals
Screw connections
Check socket pins and plugs
End stops
Inspection by an expert (periodic inspection)
13
Service
13.1
Slewing bracket
Use
Bearings
10
at
Inspection
Inspection
commissioning
all 3 month
all 12 month
X
X
X
X
Recommendation
FUCHS
RENOLIT FEP2
X
X
Intervals
12 month
if bigger
0,5 kg
pollution
grease all 3
month
5.52.732.00.01.05

Advertisement

Table of Contents
loading

Table of Contents