Mushroom" Vent Terminal; Connections To The Air Box - Lochinvar 300 Installation And Operating Manual

Residential gas water heaters
Table of Contents

Advertisement

"Mushroom" Vent Terminal

Figure 24.
AIRBOX
INTAKE
PIPING
Figure 25.

Connections To The Air Box

1. Slide an O-ring over each of the fittings on the air box.
Note: An appropriate sized O-ring can be ordered from
the heater manufacturer. Request kit number 100269737.
2. Slide the exhaust vent piping over the exhaust fitting
on the air box. Ensure the O-ring remains in place
between the piping and the fitting.
3. Slide the air intake vent piping over the air intake fitting
on the air box. Ensure the O-ring remains in place
between the piping and the fitting.
4. Drill 7/64" pilot holes for a #8 screw (see Figure 26).
Take care not to damage the O-ring.
5. Secure the vent piping to the air box with screws (see
Figure 26).
100304522_2000545236 _Rev. 02
"MUSHROOM"
VENT TERMINAL
EXHAUST
PIPING
www. lochinvar .com
SCREW
O-RING
VENT
PIPING
Figure 26.
3" VENT
3" VENT
PIPING
PIPING
(INTAKE)
(EXHAUST)
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

301

Table of Contents