Environmental Safety; Electrical Installation; Recycling Guidelines - Xylem Rule 27SA Instruction Manual

Fully automatic bilge pump
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Make sure that the lifting equipment is in good condition
Use a lifting harness, a safety line and a breathing device as required
Allow all system and pump components to cool before you handle them
Make sure that the product has been thoroughly cleaned
Disconnect and lock out power before you service the pump
Check the explosion risk before you weld or use electric hand tools
Wash the skin and eyes
Follow these procedures for chemicals or hazardous fluids that have come into contact with your eyes or skin:
Condition
Chemicals or hazardous
fluids in eyes
Chemicals or hazardous
fluids on skin

Environmental safety

The work area
Always keep the station clean
Waste and emissions regulations
Observe these safety regulations regarding waste and emissions:
Appropriately dispose of all waste
Handle and dispose of the processed liquid in compliance with applicable environmental regulations
Clean up all spills in accordance with safety and environmental procedures
Report all environmental emissions to the appropriate authorities
WARNING: Radiation Hazard.
Do NOT send the product to Xylem if it has been exposed to any nuclear radiation.

Electrical installation

For electrical installation recycling requirements, consult your local electric utility.

Recycling guidelines

Always follow local laws and regulations regarding recycling.
Action
1. Hold your eyelids apart forcibly with your fingers
2. Rinse the eyes with eyewash or running water for at least 15 minutes
3. Seek medical attention
1. Remove contaminated clothing
2. Wash the skin with soap and water for at least 1 minute
3. Seek medical attention, if necessary
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rul-27sa

Table of Contents