Drolet DB03105 Installation And Operation Manual page 104

Hide thumbs Also See for DB03105:
Table of Contents

Advertisement

Report prepared for: Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on 12/1/2017 8:00:00 AM
manufacture the Listed product(s) in accordance with the specifications information stated herein.
The Intertek Field Representative shall determine that the product is manufactured in accordance with this
Report and that certification procedures are followed.
In the case where a discrepancy exists between the product and this Report, this Report will be
considered correct, and therefore the Applicant has the responsibility for making the necessary corrections
so that the product will meet the specifications stated herein.
COMPONENTS
Components used shall be those itemized in this Intertek Report covering the product, including any
amendments and/or revisions.
CERTIFICATION MARK
The Intertek Certification Mark applied to the products shall either be separable in form, such as labels
purchased from Intertek, or on a product nameplate or other media only as specifically authorized by
Intertek. Use of the Intertek Certification Mark is subject to the control of Intertek.
MANUFACTURING AND PRODUCTION TESTS
Manufacturing and Production Tests shall be performed as required in this Report.
FOLLOW-UP SERVICE
Periodic unannounced Follow-up Service Inspections of the manufacturing facility shall be
conducted by Intertek. A Follow-up Service Inspection Report shall be issued after each visit.
Special attention will be given to the following:
1. Conformance of the manufactured product to the descriptions in this Report.
2. Conformance of the use of the Intertek Certification Mark with the requirements of this Report
and the Intertek Certification Agreement.
3. In-plant quality control procedures and personnel.
4. Manufacturing processes and changes.
5. Performance of specified manufacturing and production tests.
In the event that the Intertek Field Representative identifies variance(s) to any provision of this
Report, the Applicant shall take one or more of the following actions:
1. Correct the non-conformance.
2. Remove the Intertek Certification Mark from non-conforming product.
3. Contact the Intertek office that issued this Report for additional instructions.
GENERAL REQUIREMENTS AND DEFINITIONS
Accepted - Accepted by Intertek. All inquiries regarding change to Listed products must be
presented to Intertek in writing for consideration and acceptance.
Stove Builder International Inc. | 35697 | Rev: Nov 30 2017 11:01AM | Uncontrolled Copy
Page 218 of 245

Advertisement

Table of Contents
loading

This manual is also suitable for:

Escape 1800

Table of Contents