Summary of Contents for WE-EF LEUCHTEN AFL100 Series
Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Post Mounted Luminaires AFL100 series Do not open during installation This product is factory-sealed. Refer to the instructions contained in this document for details. Surge Protection Surg g This product features built-in surge protection circuitry in compliance This with applicable standards.
Post Mounted Luminaires AFL120 ø 89 191.5 AFL130 ø 89 191.5 IP66. IK08. Class I, II. T a see table in step 4, on the last page ø 9 – 14 mm 1 – 2.5 mm Tool required Torx 20, 45 5 mm Allen key Weight Mounting height...
Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried Warning: Do not open luminaire while mains supply is switched on. Caution: Risk of electric shock! Installation The product must be installed and maintained by a...
Page 4
Post top and Side entry Attachment M can be mounted vertically or horizontally. To change position loosen fasteners J, rotate by 180° and refasten. For vertical mounting, attachment can be set at 0° or 2.5° by loosening screws J. For horizontal mounting, attachment can be set at 0°, 2.5°, 5°, 7.5°, 10°, 12.5°, and 15°.
Installation Procedure 2) Pull the connecting cable through the pole. Place the luminaire on top of the pole and tighten fasteners B, tightening to a torque of 10 Nm. ø 40-60 x 100* ø 76 x 100 Side entry Post top...
Page 6
3) Trim mains cable E to the desired length and connect the leads to their respective terminals at the base of the pole: a) ON/OFF (L = Phase, N = Neutral, = Earthing) b) BASIC (L1 = Phase 1, L2 = Phase 2,N = Neutral, = Earthing) c) DALI (L = Phase, N = Neutral, = Earthing, DA/DA = DALI control line)