Komatsu PC600LC-7 Manual page 153

Hide thumbs Also See for PC600LC-7:
Table of Contents

Advertisement

STRUCTURE, FUNCTION AND MAINTENANCE STANDARD
1. At boom RAISE
Operation
When the boom is raised, the main pressure
from the control valve pushes poppet (5) up.
Because of this, the main pressure from the
control valve passes through the valve and
flows to the bottom end of the boom cylinder.
PC600, 600LC-7
BOOM HOLDING VALVE
10-121

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc600-7

Table of Contents