Check After Installation - Gree U-Match GUD35T/A-S Owner's Manual

Table of Contents

Advertisement

DC Inverter U-Match Series Cassette Type Unit
b) Wire routing of unified power supply for three-phase.
Power cord should be secured along with the right side plate and fixed
to the hook with a wire clamp so as to avoid contacting the pipeline.
The communication line between indoor and outdoor units should also
be laid along with the right side plate but away from the power cord.

3.4 Check after Installation

Check Items after Installation.
Check items
Is the main body installed
securely?
Did you do water leakage test?
Is the unit well insulated from
heat?
Does water drainage go well?
Is the voltage consistent with that
stated on the nameplate?
Are the wires and pipes installed
correctly?
Has the unit been safely
grounded?
Do the specifications of wires
comply with the requirement?
Is there any obstacle blocking the
air inlet and outlet of the indoor or
outdoor units?
Have you recorded the length of
refrigerant pipe and the refrigerant
charging amount?
Possible events due to improper installation
The unit may fall down, vibrate or produce
noise.
Cooling capacity may become
unsatisfactory.
Condensate, water drops may occur.
Condensate, water drops may occur.
The unit may fail or its components may get
burned.
The unit may fail or its components may get
burned.
Risk of electric leakage.
The unit may fail or its components may get
burned.
Cooling capacity may become
unsatisfactory.
The refrigerant charging amount can't be
controlled.
46