Test Boiler; Burner Equipment - Riello 20068219 Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

4.9

Test boiler

The burner/boiler combination does not pose any problems if the
boiler is EC approved and its combustion chamber dimensions
are similar to those indicated in the diagram (Fig. 4).
If the burner must be combined with a boiler that has not been EC
approved and/or its combustion chamber dimensions are clearly
smaller than those indicated in the diagram, consult the manufac-
turer.
4.10

Burner equipment

Gasket for gas train adaptor. . . . . . . . . . . . . . . . . . . . . . . . No. 1
Adaptor for gas train. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Screws for fixing the gas train adaptor: M 16 x 70 . . . . . . No. 4
Thermal insulation screen . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
M 18 x 60 screws to secure the burner flange to the boiler No. 4
Cable grommets kit for optional electrical wiring input . . . . No. 1
M16 x 6 studs for fixing the gas elbow to the pipe coupling . . .No. 4
M16 nuts to fix the gas elbow to the pipe coupling . . . . . . No. 4
Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
Spare parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
20075006
Technical description of the burner
12
GB
The firing rates were set in relation to special test boilers, accord-
ing to EN 676 regulations.
In Fig. 4 you can see the diameter and length of the test combus-
tion chamber.
Example: RS 610/M BLU
Output 5000 kW - diameter 100 cm - length 5 m
20057548
Fig. 4

Advertisement

Table of Contents
loading

Table of Contents