Preparatory Activities; Connecting The Media Lines; Adjust Valve; Electrical Installation - Becker DT 4.25 Translation Of The Operating Instructions

Rotary vane-compressor
Table of Contents

Advertisement

18 |
DT 4.10, DT 4.16, DT 4.25, DT 4.40, DX 4.10, DX 4.16, DX 4.25, DX 4.40
6.2

PREPARATORY ACTIVITIES

6.2.1

CONNECTING THE MEDIA LINES

Size
DT 4.10
DT 4.16
DT 4.25
DT 4.40
DX 4.10
DX 4.16
DX 4.25
DX 4.40
Table 6.2: Connection sizes (suction side)
6.2.2

ADJUST VALVE

6.3

ELECTRICAL INSTALLATION

DANGER
Danger to life from electric shock - Personnel qualification
Remove sealing plug
For transport, the pressure connection is protected against the ingress of
dirt and foreign bodies with a sealing plug. This must be removed before
commissioning.
Dimensioning of the pressure line
Make the pipes at least the same diameter as the nominal connection
size.
For cable lengths > 2 m, the next larger cross-section must be
selected.
For pipe lengths > 5 m we recommend the additional installation of
non-return valves.
Keep connections free of oil, grease, water and other contamination.
The supply line is to be installed mechanically stress-free by means of a
flexible hose or fixed pipe.
Setting the pressure
The pump is usually equipped with a pressure regulating valve, which
allows the pressure required for the application to be set.
Depending on the variant, this value is limited. (chap. 9.2)
Connection
G 1/2 "
G 1/2 "
G 3/4 "
G 3/4 "
G 1/2 "
G 1/2 "
G 3/4 "
G 3/4 "