Spectra Logic Spectra 20K Install Manual

Spectra Logic Spectra 20K Install Manual

Library
Hide thumbs Also See for Spectra 20K:

Advertisement

Spectra 20K Library
Unpacking and Installation Guide
90920002 Revision B

Advertisement

Table of Contents
loading

Summary of Contents for Spectra Logic Spectra 20K

  • Page 1 Spectra 20K Library Unpacking and Installation Guide 90920002 Revision B...
  • Page 2: Spectra Logic Contact Information

    In no event shall Spectra Logic be liable for any loss of profits, loss of business, loss of use or data, interruption of business, or for indirect, special, incidental, or consequential damages of any kind, even if Spectra Logic has been advised of the possibility of such damages arising from any defect or error.
  • Page 3: Table Of Contents

    Spectra 20K Library Unpacking and Installation Guide Contents Introduction ... 4 Prepare the Unpacking Location... 5 Unpack the Library ... 6 Remove the Internal Packaging ... 9 Check the Transport Tray and Picker Motion... 14 Replace the Robotic Rack Assembly ... 16 Install Components...
  • Page 4: Introduction

    Introduction About This Guide This document describes the steps needed to unpack and install the Spectra 20K library. If you have questions about any of the procedures you can access more detailed documentation on the Spectra Logic Web site at: www.spectralogic.com.
  • Page 5: Prepare The Unpacking Location

    Spectra 20K Library Unpacking and Installation Guide Prepare the Unpacking Location You will need 10 feet of access at the front and back of the crate to safely unpack the library. Once the library is out of the crate, you will need to move the library to a work space where you have access to all four sides.
  • Page 6: Unpack The Library

    Figure 1 Check Tip n Tell and Shockwatch. Caution: Do not unpack the library if Tip N Tell or Shockwatch has been tripped. Contact both the shipping company and Spectra Logic. Spectra 20K Library Unpacking and Installation Guide Tip n Tell...
  • Page 7 3. Use the scissors to cut the plastic bands holding the library and its boxes to the crate (Figure 2). Figure 2 Cut the plastic bands. 4. Remove the protective cardboard corners, and set aside the drive box(es) and rail kit (Figure 3).
  • Page 8 Caution: Do not unpack the library Shockwatch has been tripped. Contact both the shipping company and Spectra Logic. Figure 4 Remove the plastic cover. Warning: The library is heavy, about 267 lbs (121 kg). Use three or four people to help move the library.
  • Page 9: Remove The Internal Packaging

    Figure 5 The robotic rack and the connector at the bottom front of the library. 4. Unplug the 25-wire black connector at the bottom front of the robotic rack assembly, if necessary (Figure 5). Spectra 20K Library Unpacking and Installation Guide...
  • Page 10 6. Remove the five screws holding the robotic rack assembly in the chassis (Figure 7). Figure 7 Location of the five screws in the chassis. Spectra 20K Library Unpacking and Installation Guide Figure 6 The three screws holding the robotic rack assembly to...
  • Page 11 Note: Two of the top three screws are located at both ends of the top bracket that attaches to the library, and one screw is located just to the right of the robotic rack in the middle of the bracket. The bottom two screws are located at both ends of the bottom bracket.
  • Page 12 Gently loosen the strap through the plastic clip until one side is free (Figure 10). iii. Once one side is free, remove the strap completely from the picker rack. Spectra 20K Library Unpacking and Installation Guide Picker Transport tray Figure 10 Gently loosen the strap.
  • Page 13 Note: Screw the shipping pins into the pin mounting block located under the drive bay at the bottom of the unit for possible later use. Spectra 20K Library Unpacking and Installation Guide Figure 11 The rear shipping pins being removed.
  • Page 14: Check The Transport Tray And Picker Motion

    Ensure that the assembly moves smoothly and easily (Figure 13). Figure 13 The gripper assembly moves front to back. 3. Rotate the entire gripper assembly in both directions (Figure 14). Spectra 20K Library Unpacking and Installation Guide...
  • Page 15 4. Locate the gripper jaws, and slide the gripper jaws forward and back. Leave the gripper jaws in a fully retracted position (pushed back), after checking their movement (Figure 15). Figure 15 The gripper jaws rotate forward and back. (Gripper jaws shown in extended position.) Spectra 20K Library Unpacking and Installation Guide...
  • Page 16: Replace The Robotic Rack Assembly

    3. Replace the five flush screws that hold the robotic rack assembly in the chassis (Figure 16). Figure 16 Location of the five screws in the chassis. Spectra 20K Library Unpacking and Installation Guide...
  • Page 17 4. Replace the three screws holding the robotic rack assembly to the drive bay (Figure 6). 5. Plug in the 25-wire black connector at the bottom front of the robotic rack assembly (Figure 18). Figure 18 Plug in the connector at the bottom front of the library.
  • Page 18 Install Components on page 19, to complete the unpacking and installation procedure. Warning: The Spectra 20K library is heavy, about 267 lbs (121 kg). Use at least three people when moving the library. If the library is not going to be rack mounted, go to Install Components on page 19, to complete the unpacking and installation procedure.
  • Page 19: Install Components

    It uses a dual Gigabit Ethernet 1000Base-LC connection. Through Spectra Logic’s TAOS for protocol translations necessary to operate in IP-based storage environments (ITP, iSCSI, NDMP, etc.). Spectra 20K Library Unpacking and Installation Guide architecture, the G2 E-QIP is responsible ™...
  • Page 20: Install Qips

    QIP will depend on how you choose to partition the library. The bottom QIP supports the bottom four drive slots, the top QIP supports the top four drives. See the Spectra 20K Library User Guide for details. 1. Remove the QIP from the packaging and protective bag.
  • Page 21: Install Drives

    5. Move the library to its permanent location (if necessary) and proceed to Power On on page 22. Warning: The Spectra 20K library is heavy, about 267 lbs (121 kg). Use at least three people when moving the library. Drive...
  • Page 22: Power On

    Spectra 20K Library Unpacking and Installation Guide Power On 1. Locate the power inlet and power switch on the rear of the library (Figure 20). Power plug Power switch Figure 20 Location of the power inlet and the power switch.
  • Page 23: Initialization

    3. Then, check the status lights of all components in the rear of the library and verify that they are all green. 4. Once the initialization is complete, verify that the drives were installed correctly. Go to Verify Drive Installation on page 24. Spectra 20K Library Unpacking and Installation Guide...
  • Page 24: Verify Drive Installation

    Type in the Username SU, and then select OK on the virtual keyboard. Select OK again, without entering any password (Figure 22). You will now have access to all the LC toolbars. Figure 22 Login Screen. Spectra 20K Library Unpacking and Installation Guide Figure 21 The Switch User Icon.
  • Page 25 Spectra 20K Library Unpacking and Installation Guide 3. Select the Drives bar, located in the middle of the general status screen (Figure 23). Figure 23 General Status screen.
  • Page 26 Spectra 20K Library Unpacking and Installation Guide 4. The Drive Configuration menu appears (Figure 24). Figure 24 The Drive Configuration screen displaying two drives installed. There are three columns of information displayed for each drive slot. The left column lists the drive number and whether or not it is installed. The center column lists the model number on the top line, then the firmware revision, and the serial number on the last line.
  • Page 27: System Setup

    Spectra 20K Library Unpacking and Installation Guide System Setup 1. Select Toolbars and then select Configuration. 2. Select the System icon. The System Configuration window appears (Figure 25). Figure 25 The System Configuration window.
  • Page 28 Spectra 20K Library Unpacking and Installation Guide To Set the Date and Time 1. Select Set Time, the Set System Time window appears (Figure 26). Figure 26 The Set System Time window. 2. Use the -/+ keys to select desired date and time.
  • Page 29: Option Enablement

    3. Select Submit Key. Your keyed option is now enabled. 4. Continue to enter all the key codes purchased from Spectra Logic. Once you are finished, go to Partitioning the Library on page 30. Spectra 20K Library Unpacking and Installation Guide...
  • Page 30: Partitioning The Library

    You will not be able to run the necessary test unless at least one partition has been defined. To partition your library, you will need to use your Spectra 20K Library User Guide that was shipped with this library.
  • Page 31: Install New Picker

    5. There are no parameters for this test, so select Run. Once the picker has finished running the test, a message will appear reading Install New Picker Succeeded. Select OK to clear this message and go to Load Media on page 32. Spectra 20K Library Unpacking and Installation Guide...
  • Page 32: Load Media

    Spectra 20K Library Unpacking and Installation Guide Load Media You are now ready to load media. 1. Select Toolbars, then select General. 2. Select the Inventory icon. Figure 29 The Inventory screen. 3. Select the appropriate partition from the Partition pull-down menu in the upper right-hand corner of the Inventory screen.
  • Page 33: Finish

    Spectra 20K Library Unpacking and Installation Guide Finish This completes the Spectra 20K library unpacking and installation procedure. If You Have Difficulty If you need further assistance with any part of these procedures, call Spectra Logic Technical Support at (800) 227-4637 or (303) 449-6444, extension 3175.

Table of Contents