Matsing MS-6H90 Instruction Manual
Hide thumbs Also See for MS-6H90:

Advertisement

Quick Links

TABLE OF CONTENTS:
1.00
BEAMS & CONNECTORS:
1.10
1.20
1.30
2.00
2.10
2.20
3.00
3.10
3.20
4.00
4.10
4.20
5.00
5.10
5.20
5.30
5.31
5.40
5.41
5.42
5.43
Revision History:
Date
Revised mounting bracket types of bolts and nuts sets use
21-Sep-21
and general updates.
Include RET Controller Display & Add RET Replacement /
10-Nov-23
Installation Caution Point
email:
info@matsing.com
MS-6H90
Date
Prepared by
10 Nov 2023
Ray Ling
INSTRUCTION MANUAL MS-6H90
Description
website:
Instruction Manual
Approved by
Patrick Yeo
www.matsing.com
Document nos
MS-6H90-IM-001
Revision
Revised by
nos.
Ray Ling
Ray Ling
Page
Revision
2
1
2
1
/
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MS-6H90 and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsing MS-6H90

  • Page 1 Date Prepared by Approved by Document nos Revision 10 Nov 2023 Ray Ling Patrick Yeo MS-6H90-IM-001 INSTRUCTION MANUAL MS-6H90 TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam Direction 1.20 Plan View Connector Layout 1.30 Connector Ports Table 2.00...
  • Page 2 1.10 Plan View Resultant Beam Direction 0˚ Plan View Resultant Beam Directions Frequency: 1695 – 0 MHz 1.20 Plan View Connector Layout MS-6H90 PLAN VIEW CONNECTOR LAYOUT 1.30 Connector Ports Table BEAM 6 BEAM 5 BEAM 4 BEAM 3 BEAM 2...
  • Page 3 2.00 PATTERN DIAGRAM 2.10 Horizontal Beam Pattern 2.20 Vertical Beam Pattern 3.00 TILT ADJUSTMENT / RET INSTALLATION or REPLACEMENT PROCESS 3.10 Manual Tilt Adjustment Step 1: Tilt Stopper Loosening Step 2: Adjusting the Tilt Step 3: Tilt Stopper Tightening Page...
  • Page 4 3.20 RET Installation / Replacement Process (Reverse for Uninstallation) Step 3: Install the Hex Step 1: Uninstall the shaft Step 2: Uninstall the shaft adaptor and screw it on stopper Handle Step 5: RET Actuator stub Step 4: Install the RET Step 6: RET Tighten to gap facing out attachment interface...
  • Page 5 4.00 RET Controller Display 4.10 RET Discover and Active Model/Serial no./Beam No. 4.20 Beam 1-6 Operations Display Page...
  • Page 6 5.00 TRANSPORTATION / INSTALLATION 5.10 Transportation (From Point to Point) Strictly comply to the Local authority and regulatory on Workplace Safety and Health Control and Measure when moving and transportation of large or heavy equipment, appropriate material handling machine should be use. (Risk Assessment apply for Forklift or Pallet Truck Lifting) 5.20 Bracket Mounting...
  • Page 7 5.30 Installation using a crane Strictly comply to the local authority and regulatory on Workplace Safety and Health Control and Measure when performing lifting of large or heavy equipment, appropriate material handling machine should be used and only certified personnel should perform the task. (Risk Assessment requirement applies for both Up-Lifting and Down-Lifting.) 5.31 Lifting the Antenna...
  • Page 8 5.40 Antenna Installation With reference to "Bracket Mounting Procedure", End user is required to Custom-Make the additional supporting bracket and tighten it to the existing Antenna bracket to meet the deployment needs. 5.41 Antenna Leveling After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...

Table of Contents