Page 1
Range Name: Sienna Box dimensions: L89.5xW55xH93(cm) 5 Drawer Chest THIS INSTRUCTION BOOKLET CONTAINS IMPORTANT SAFETY INFORMATION. PLEASE READ AND KEEP FOR FUTURE REFERENCE. 20 minutes approx Two adults assembly time assembly required Page 1 This product is intended for domestic use only, not for commercial purposes.
Page 2
Important Assembly Tip Before you begin, we advise laying everything out on a clean and soft level surface to avoid damaging the unit or your floor. It's best to identify all of the parts and fittings to build your 5 drawer chest, and to familiarise yourself with all of the parts and fittings before building. Top Tip We recommend that you build your new 5 drawer chest in the room you'd like it to be located.
Page 3
Parts checklist Please check you have all the parts listed below with your product: Do not discard any of the packaging until you have checked that you have all the parts and the pack of fixings. (Handles are pre-attached inside of the drawers) 5 Drawer Chest x1pc 240mm Leg x4pcs 120mm Handle x8pcs...
Page 4
Step 1: Attaching the legs to the bottom of 5 drawer chest 4pcs 4pcs Step 2: Drawer handles are pre-assembled reversely. Disassemble the handle and re-attach as shown in the figure. Page 4...
Page 5
Step 3: Anti Tipping Kit Installation on the item 2pcs 4pcs Step 4: Anti Tipping Kit Installation on the wall WALL Before applying the bracket to the wall, check 4pcs pipes and cables that may be hidden behind. 2pcs WARNING: Manufacturer assumes no liability for 4pcs improper installation or excessive loads placed on screws or bracket.
Need help?
Do you have a question about the Sienna and is the answer not in the manual?
Questions and answers
How do you take out the draws
How do you take the draws out?
How can you get the drawers out? Stuff has fallen behind