INSTALLATION

1. Removing the packaging materials and tapes
Remove all transportation packaging materials and tapes. Open the doors and ventilate the unit. If
the outside panels are dirty, clean them with a diluted neutral dishwashing detergent.
detergent can damage the plastic components.
detergent.) After the cleaning with the diluted detergent, always wipe it off with a wet cloth. Then wipe
off the panels with a dry cloth.
Note:
Remove the cable tie banding the power supply cord. Prolonged banding may cause the corrosion of the
cord coating.
2. Adjusting the leveling foot
Extend the leveling feet by rotating them counterclockwise to contact them to the floor. Ensure the unit
is level. (Fig. 1)
3. Fixing the unit
Two fixtures are attached to the rear of the frame. Fix the frame to the wall with these fixtures and
rope or chain. (Fig. 2)
4. Ground (earth) (Except for USA and CANADA)
The ground (earth) is for preventing the electric shock in the case of the electrical insulation is somehow
degraded. Always ground the unit at the time of installation.
WARNING
Use a power supply outlet with ground (earth) to prevent electric shock. If the power supply outlet is
not grounded, it is necessary to install a ground by qualified engineers.
Never ground the unit through a gas pipe, water main, telephone line or lightning rod. Such
grounding may cause electric shock in the case of an incomplete circuit.
5. Installing the earth leakage breakers
This product is to be connected to a dedicated circuit protected by branch circuit breaker.
Contact our sales representative or agent.
Leveling foot
Fig.1
For the dilution, refer to the instruction of the
12