Maintenance - CyberPower OL1000RTXL2U User Manual

Hide thumbs Also See for OL1000RTXL2U:
Table of Contents

Advertisement

MAINTENANCE

Storage
To store your UPS for an extended period, cover it and
store with the battery fully charged. Recharge the battery
every three months to ensure battery life.
Battery Replacement
Please read and follow the Safety Instructions before
servicing the battery. Battery replacement should be
performed by trained personnel who are familiar with the
procedures and safety precautions. Make a note of the
replacement battery tray number.
Replacement Batteries
Please refer to the front side of the UPS for the model
number of the correct replacement batteries. For battery
procurement, log onto www.cyberpowersystems.com or
contact your local dealer.
Battery Disposal
Batteries are considered hazardous waste and must be
disposed of properly. Contact your local government for
more information about proper disposal and recycling of
batteries. Do not dispose of batteries in fire.
CyberPower Systems encourages environmentally sound
methods for disposal and recycling of its UPS products.
Please dispose and/or recycle your UPS and batteries in
accordance with local regulations.
Step 1: Remove the front panels.
Step 4: Fasten back the connectors on
the battery retaining cover. Then insert
the battery connectors and tighten the
screws of battery retaining cover.
Safety Precautions
CAUTION! Only use replacement batteries which are
certified by CyberPower Systems. Use of incorrect battery
type is an electrical hazard that could lead to explosion,
fire, electric shock, or short circuit.
CAUTION! Batteries contain an electrical charge that can
cause severe burns. Before servicing batteries, please
remove any conductive materials such as jewelry, chains,
wrist watches, and rings.
CAUTION! Do not open or mutilate the batteries.
Electrolyte fluid is harmful to the skin/eyes and may
be toxic.
CAUTION! To avoid electric shock, turn off and unplug the
UPS from the wall receptacle before servicing the battery.
CAUTION! Only use tools with insulated handles.
Do not lay tools or metal parts on top of the UPS or
battery terminals.
Step 2: Remove the retaining
screws from the cable protection
cover and then remove the cover
itself.
Step 5: Install the front panels. Execute a battery test via the LCD control
panel, go to the Configuration Menu, then scroll to the UPS Diagnostic
then select battery test and Activate, then scroll to ResetReplaceBAT to
reset the battery replacement date. This operation can also be done via
PowerPanel® Business Edition Agent or RMCARD web interface. Please
see their respective User Manuals for detailed instructions.
Step 3: Pull the battery tray
out slowly and then put the
new battery tray back into the
compartment.

Advertisement

Table of Contents
loading

Table of Contents