Ice Thickness And Water Purge Adjustment - Scotsman Prodigy ELITE MC222 ECC Installation And User Manual

Remote low side modular cube with condensing unit
Table of Contents

Advertisement

MC222 and Condensing Unit
Remote Low Side User Manual

Ice Thickness and Water Purge Adjustment

Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge thickness
adjustment screw in 1/16 turn increments CW to
increase bridge thickness.
5. Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
6. Return curtain and evaporator cover to their
normal positions.
7. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings or
left on automatic.
Setting
Water Type
1
Minimum - RO water or equivalent
2
Moderate - Low TDS, non RO
3
Standard - Use with typical water
4
Heavy - High TDS
5
Maximum - Very high TDS
A
Automatic - Factory setting
To set:
1. Switch the machine OFF by holding the Off button
in until a number or the letter A shows on the
display.
2. Press and release the On button repeatedly until
the number on the display corresponds to the
desired setting.
3. Press and release the Off switch again to return to
the normal control state.
1/8 to 3/16"
Bridge
Bridge Thickness Adjustment Mechanism
June 2022
Page 20
ice Bridge Thickness
Adjustment
Screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prodigy elite a series

Table of Contents