Installing A Hot-Swap Fan Assembly - IBM 7944 Installation And User Manual

Table of Contents

Advertisement

Figure 51. ServeRAID M5000 advanced feature key installation
If you have other devices to install or remove, do so now. Otherwise, go to
page
100.

Installing a hot-swap fan assembly

Use this information to install a hot-swap fan assembly.
The server comes standard with five dual-motor hot-swap cooling fans.
Attention: To ensure proper operation, replace a failed hot-swap fan within 30 seconds.
To install an additional hot-swap fan, complete the following steps:
Step 1.
Read the safety information that begins on
41.
Step 2.
Remove the cover (see
Step 3.
Touch the static-protective package that contains the new fan to any unpainted metal surface on
the server. Then, remove the new fan from the package.
"Safety" on page iii
"Removing the cover" on page
"Completing the installation" on
and
"Installation guidelines" on page
48).
.
Chapter 2
Installing optional devices
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3550 m34254

Table of Contents