N N o o t t e e : : If required, transition to larger venting within 2'
of the cabinet. An 2" x 3" offset coupling is
required if the transition is made in a horizontal
plane. Use coupling CPL01544 (Canadian
applications may use BAYREDUCE to meet ULC-
S636 requirements.) See Horizontal Venting
section for proper orientation of 2" x 3" offset
coupling.
23. Connect PS2 tubing to switch and sensing location.
I I m m p p o o r r t t a a n n t t : : Trim the condensate pressure switch
tubing to length to ensure there is no sag or
trap created.
24. Remove port cap at bottom of inducer and connect
inducer condensate tubing. Connect other end of
S9V2-VS-SVX001-1C-EN
F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
inducer condensate tubing to top port on the
condensate trap. Cut tubing to length, if necessary.
25. Install previously removed port cap onto bottom
port of the inducer.
26. Connect condensate pressure switch tubing to
pressure port on the condensate trap.
I I m m p p o o r r t t a a n n t t : : Cut to length to ensure there is no sag
or trap created.
27. Remove port plug from rain gutter and install in
new position on opposite side of the rain gutter.
28. Connect rain gutter condensate hose to the rain
gutter and the lower port of the condensate trap.
Cut to length, as required.
87