Trane S9V2B040U3VSB Installation, Operation And Maintenance Manual page 79

Table of Contents

Advertisement

19
20. Slide PVC through vent outlet adaptor and insert
into inducer outlet.
21. Twist to insure PVC is fully inserted.
22. Tighten the two clamps.
23. Install the combustion air inlet PVC pipe.
N N o o t t e e : : The vent outlet adapter is used for strain relief
against the weight of the venting. The clamp
should be tightened after the internal connection
is made.
N N o o t t e e : : If required, transition to larger venting within 2'
of the cabinet. CPL01544 – 2" x 3" offset coupling
may be used and is factory supplied with 120
MBTUH furnaces. Canadian applications may
use BAYREDUCE to meet ULC-S636
requirements.
Condensate Trap Installation
24. Reinstall the condensate adapter if it was earlier
removed or ensure adapter is still in place.
I I m m p p o o r r t t a a n n t t : : The condensate adapter must be present
for proper condensate drain operation.
25. Install condensate trap into new location by fitting
into grommet and aligning the hole on the
condensate trap with the hole labeled "HR".
S9V2-VS-SVX001-1C-EN
18
F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
I I m m p p o o r r t t a a n n t t : : When installing a 21.0" wide S-Series
furnace, the condenser trap grommet must
be rotated so that the notch in the grommet
faces the outer edge of the furnace cabinet
as shown in the illustrations below and to
the top left in next page. This allows the
rain gutter tubing to fully seat onto the
lower condensate port trap.
26. Hand tighten screw.
79

Advertisement

Table of Contents
loading

Table of Contents