JLG B300001393 Operation And Safety Manual page 160

Table of Contents

Advertisement

SECTION 7 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
1. Start all nuts by hand to prevent cross threading. DO NOT
use a lubricant on threads or nuts.
2. Tighten nuts in the following sequence:
3. The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
7-30
Table 7-18. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
40 ft. lbs.
95 ft. lbs.
(55 Nm)
(130 Nm)
4. Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
3rd Stage
170 ft. lbs.
(230 Nm)
3121615

Advertisement

Table of Contents
loading

This manual is also suitable for:

0300177361

Table of Contents