Installing the Hoses with a Trencher (continued)
4. Connect the long hardline, from this kit, from the straight connector on the hydra borer
valve to the 45-degree connector on the trencher control valve.
5. Fully tighten the hydraulic valve assembly mounting hardware; torque the nuts to 23 to
29 N⋅m (17 to 21 ft-lb).
Installation: Installing the Hoses
G434428
Page 2–9
3462-340 A