Package Includes; Installation Instructions; Starting Pump - Pentair MYERS TPL15 Installation And Service Manual

Grinder pumps
Table of Contents

Advertisement

PACKAGE INCLUDES

1. Heavy fiberglass basin with steel sump cover and
separate removable cast iron pump cover and
one blank pump cover (two cast iron covers are
in duplex package.) Sump cover has 3" NPT vent
flange.
2. Inlet flanges for SDR-35 or Sch. 40 plastic pipe.
3. 1½" galvanized support pipe and conduit for motor
cords. (Two for duplex package.)
4. 1¼" galvanized discharge pipe, two pipes T.O.E.
(Two for duplex package.)
5. 1¼" slip coupling for discharge pipe. (Two for
duplex package.)
6. 3 level controls. (Four for duplex package.)
7. CV-125 angle check valve. (Two for duplex
package.)

INSTALLATION INSTRUCTIONS

1. Remove pump cover and take out all parts. DO
NOT REMOVE STEEL BASIN COVER.
2. Use template furnished with inlet flange to cut
hole in basin and drill for mounting bolts. Mount
inlet flange at height required.
3. Basin is now ready to set in ground. Pour cement
around basin and up to basin flange to anchor
basin in the ground.
PREPARING PUMP FOR MOUNTING
IN BASIN
1. Screw one-half of 1¼" galvanized pipe into
pump discharge. Use pipe dope or Teflon tape
on threads.
2. Pull two motor cords up through 1½" galvanized
support pipe and screw onto pump. Be sure pipe
coupling is on pipe.
3. Connect other half of 1¼" discharge pipe with 1¼"
slip coupling. Firmly tighten.
4. Place pump cover over pipes and tighten
flanges to hold in place.
5. For simplex package only: Plug extra hole with
solid rubber plug and insert "OFF", "ON" and
"ALARM" controls through rubber grommets.
Adjust cords to proper length. Insert floats through
holes provided in cover. Push rubber grommets
into holes.
6. Place gasket on steel basin cover. Use permatex
on bottom side only to hold in place.
7. Lift pump and cover and lower into basin. Secure
with bolts.
8. Power cords are taken to control box for
connecting. The motor cords can be installed in
flexible conduit if desired or can be left open and
taped together.
TPL15-SS1 (SIMPLEX) & SS2 (DUPLEX) PACKAGES

STARTING PUMP

1. With circuit breaker at control box in "OFF"
position, turn hand-off-auto switch to "AUTO"
position.
2. Turn circuit breaker to "ON" and run water
into basin.
3. When level tilts upper float, pump should start and
should run until lower float is deactivated, causing
pump to stop.
4. Repeat cycle several times. Yellow run light should
come on each time pump runs.
5. Turn hand-off-auto switch to "OFF" (both for
duplex) and run water into basin until alarm switch
activates.
ALWAYS TURN THE ALARM SWITCH TO "ON"
POSITION AFTER TESTING.
6. Turn hand-off-auto switch to "AUTO" (both for
duplex) position and pump is ready for automatic
operation.
7. Replace cover and be sure discharge valve is
wide open.
7
23833A179 11/12/12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Myers tpl15-ss1Myers tpl15-ss2

Table of Contents