Texas Instruments bq3060EVM-001 User Manual

Texas Instruments bq3060EVM-001 User Manual

Sbs 1.1 compliant advanced gas gauge battery management solution evm

Advertisement

Quick Links

bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge
This evaluation module (EVM) is a complete evaluation system for the bq3060/bq29412 battery
management system. The EVM includes one bq3060/bq29412 circuit module. The circuit module includes
one bq3060 integrated circuit (IC), one bq29412 IC, and all other onboard components necessary to
monitor and predict capacity, perform cell balancing, monitor critical parameters, protect the cells from
overcharge, over-discharge, short-circuit, and overcurrent in 2-, 3- or 4-series cell Li-ion or Li-polymer
battery packs. The circuit module connects directly across the cells in a battery. If a designer wants to
communicate with this EVM from a Windows-based PC, a separate USB Interface Adapter EVM is
recommended. The EV2300 or EV2400 EVM interface board enables an IBM-compatible or other type PC
(with the required driver for its particular platform) to communicate with the Texas Instruments SMBus,
I2C, HDQ, or DQ interface gas gauges via a Universal Serial Bus (USB) port. With the EV2300 interface
board and software, the user can read the bq3060 data registers, program the chipset for different pack
configurations, log cycling data for further evaluation, and evaluate the overall functionality of the
bq3060/bq29412 solution under different charge and discharge conditions.
empty paras to force the title "List of Tables to second page
......................................................................................................................
1
2
3
4
5
6
7
...................................................................................................................
8
9
10
11
12
1
2
....................................................................................................................
3
4
5
6
7
....................................................................................................................
8
9
10
11
12
Windows, Microsoft are trademarks of Microsoft Corporation.
SLUU342A - October 2009 - Revised March 2012
Submit Documentation Feedback
This datasheet has been downloaded from
Battery Management Solution EVM
.............................................................................................
........................................................................................
.....................................................................................
......................................................................................................
.........................................................................................................
...................................................................................................
........................................................................................
...................................................................................
...............................................................................................................
..............................................................................................................
..............................................................................................................
................................................................................................................
...........................................................................................................
..........................................................................................................
............................................................................
.........................................................................................................
Copyright © 2009-2012, Texas Instruments Incorporated
SLUU342A - October 2009 - Revised March 2012
..................................................................
.............................................................................
.....................................................................
...........................................
bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery
http://www.digchip.com
User's Guide
Management Solution EVM
at this
page
2
2
3
4
9
9
9
11
13
15
16
17
4
5
5
5
6
6
6
8
10
11
12
14
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the bq3060EVM-001 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments bq3060EVM-001

  • Page 1: Table Of Contents

    The EV2300 or EV2400 EVM interface board enables an IBM-compatible or other type PC (with the required driver for its particular platform) to communicate with the Texas Instruments SMBus, I2C, HDQ, or DQ interface gas gauges via a Universal Serial Bus (USB) port. With the EV2300 interface...
  • Page 2: Contents 1 Features

    • The system load and charger connect across PACK+ and PACK– • To the system-present pin (SYS PRES) bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012 Management Solution EVM Submit Documentation Feedback...
  • Page 3: Bq3060 Circuit Module Schematic

    CHGFET path, and can be controlled via the setting of the DF.Configuration, ZVCHG1, 0. SLUU342A – October 2009 – Revised March 2012 bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery Management Solution EVM Submit Documentation Feedback...
  • Page 4: Circuit Module Physical Layouts And Bill Of Materials

    Figure 7), and assembly drawing for the bq3060 module. Figure 1. bq3060EVM-001 Layout (Silk Screen) bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012 Management Solution EVM Submit Documentation Feedback Copyright © 2009–2012, Texas Instruments Incorporated...
  • Page 5: Top Assembly

    Figure 2. Top Assembly Figure 3. Top Layer Figure 4. Internal Layer 1 SLUU342A – October 2009 – Revised March 2012 bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery Management Solution EVM Submit Documentation Feedback Copyright © 2009–2012, Texas Instruments Incorporated...
  • Page 6: Internal Layer 2

    Figure 5. Internal Layer 2 Figure 6. Bottom Layer Figure 7. Bottom Assembly Bill of Materials and Schematic bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012 Management Solution EVM Submit Documentation Feedback...
  • Page 7: Bill Of Materials

    6. The generic part number for Mitsubishi Material is BN35-3H103XX-XX for RT1 and RT2. If they are not available use 103AT-2 SLUU342A – October 2009 – Revised March 2012 bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery Management Solution EVM Submit Documentation Feedback Copyright ©...
  • Page 8: Schematic

    Circuit Module Physical Layouts and Bill of Materials www.ti.com Figure 8. Schematic bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012 Management Solution EVM Submit Documentation Feedback Copyright © 2009–2012, Texas Instruments Incorporated...
  • Page 9: Evm Hardware And Software Setup

    Input voltage Pack+ to Pack– Charge and discharge current EVM Hardware and Software Setup This section describes how to install the bq3060EVM-001 PC software, and how to connect the different components of the EVM. System Requirements The bq3060EVSW software requires Windows™ 2000 or Windows XP. Drivers for Windows 98SE are provided, but Microsoft™...
  • Page 10: Bq3060 Circuit Module Connection To Cells And System Load/Charger

    SMBC SMBC 2. Connect the PC USB cable to the EV2300 and the PC USB port. The bq3060EVM-001 is now set up for operation. bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012...
  • Page 11: Operation

    Operation This section details the operation of the bq3060 EVSW software. Starting the Program Run bq Evaluation Software from the Start | Programs | Texas Instruments | bq3060 EVSW menu sequence. The SBS Data screen (Figure 10) appears. Data begins to appear once the <Refresh> (single time scan) button is clicked, or when the <Keep Scanning>...
  • Page 12: Data Flash Screen, 1St Level Safety Class

    The | File | Special Export | menu options allows the data flash to be exported, but it configures the exported data flash to a learned state ready for mass production use. bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012...
  • Page 13: Calibration Screen

    Pack Voltage Calibration This calibrates the voltage at the AFE Pack pin. SLUU342A – October 2009 – Revised March 2012 bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery Management Solution EVM Submit Documentation Feedback Copyright © 2009–2012, Texas Instruments Incorporated...
  • Page 14: Calibration Screen

    Remove load/external voltage applied between Pack+ and Pack-. Press the Pack Voltage button to calibrate. Figure 12. Calibration Screen bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012 Management Solution EVM Submit Documentation Feedback...
  • Page 15: Pro (Advanced) Screen

    This screen allows device reprogramming from unencrypted and encrypted files. Figure 13. Pro (Advanced) Screen SLUU342A – October 2009 – Revised March 2012 bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery Management Solution EVM Submit Documentation Feedback Copyright © 2009–2012, Texas Instruments Incorporated...
  • Page 16: Pack Assembly And The Bq3060

    This step in not needed if the NR bit (nonremovable pack) is enabled in Operation Cfg B register. bq3060EVM-001 SBS 1.1 Compliant Advanced Gas Gauge Battery SLUU342A – October 2009 – Revised March 2012 Management Solution EVM Submit Documentation Feedback Copyright ©...
  • Page 17: Related Documentation From Texas Instruments

    Related Documentation from Texas Instruments To obtain a copy of any of the following TI document, call the Texas Instruments Literature Response Center at (800) 477-8924 or the Product Information Center (PIC) at (972) 644-5580. When ordering, identify this document by its title and literature number. Updated documents can also be obtained through the TI Web site at www.ti.com...
  • Page 18 Any exceptions to this are strictly prohibited and unauthorized by Texas Instruments unless user has obtained appropriate experimental/development licenses from local regulatory authorities, which is responsibility of user including its acceptable authorization.
  • Page 19 FCC Interference Statement for Class B EVM devices This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.
  • Page 20 Also, please do not transfer this product, unless you give the same notice above to the transferee. Please note that if you could not follow the instructions above, you will be subject to penalties of Radio Law of Japan. Texas Instruments Japan Limited (address) 24-1, Nishi-Shinjuku 6 chome, Shinjukku-ku, Tokyo, Japan http://www.tij.co.jp...
  • Page 21 FDA Class III or similar classification, then you must specifically notify TI of such intent and enter into a separate Assurance and Indemnity Agreement. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2012, Texas Instruments Incorporated...
  • Page 22 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.

Table of Contents