Optional Reclaim Coil Piping Connection; Honeywell Economizer Control W7212 - York SUNLINE MAGNUM WJ240 Installation Manual

Gas/electric single package air conditioners
Hide thumbs Also See for SUNLINE MAGNUM WJ240:
Table of Contents

Advertisement

284812-YIM-D-1008
Exhaust Air
Adjustment
Exhaust Air LED
Damper Min.
Indoor Air Quality
Max. Adjustment
Indoor Air Quality
Indoor Air Quality
Min. Adjustment
Free Cooling LED
Economizer Enthalpy
Set Point Adjustment
FIGURE 10 - HONEYWELL ECONOMIZER CONTROL W7212

OPTIONAL RECLAIM COIL PIPING CONNECTION

Remove the left front corner panel to provide access to
the reclaim coil connections (See Figure 13).
Remove the sheetmetal patch plates attached to the
base pan located beneath the reclaim coil stub-outs.
Reinstall the two-hole patch plate at the same location
using seal screws. The solid patch plate can be used
as a heat shield during subsequent brazing operations,
if needed; otherwise it can be discarded.
The reclaim coil is checked for leaks at the factory and
shipped with a holding charge of nitrogen. Before
installing connections to the reclaim coil, be sure the
coil has not developed a leak in transit by attaching a
pressure gauge to one of the service valves located on
the stub-outs. If the reclaim coil has maintained its
holding charge, the coil can be considered to be leak-
free. If the coil has lost its holding charge, the reclaim
coil must be leak-tested and any necessary repairs
made before proceeding.
22
Screw
N1
Position
P1
Screw
T1
Screw
LED
AQ1
SO+
Screw
SR+
Screw
EXH
N
Set
EXH
P
Min
Pos
T
IAQ
Max
IAQ
AQ
IAQ
Min
SO
Free
Cool
SR
B
C
A
D
The temperature required to make or break a brazed
joint is sufficient to cause oxidation of copper unless an
inert gas such as nitrogen is provided. Drill a small hole
through the end of one of the stub-out's endcaps to
release the nitrogen holding charge and enable a free
flow of nitrogen. Connect a supply of dry nitrogen
through a reducing regulator to the service port of the
opposite stub-out to allow for a continuous flow of nitro-
gen to all copper joints to be brazed.
After unbrazing and removal of the end caps, install
short-radius ells at the end of the coil stub-outs to
insure proper piping alignment with the access open-
ings in the base pan patch plate. Braze all copper-to-
copper joints with Silfos-5 or equivalent brazing mate-
rial. Do not use soft solder. The use of hard-drawn cop-
per tubing is recommended to complete the piping
connections to the reclaim coil by passing them
through the rubber grommets of the patchplate.
TR
TR1
24
24
Vac
Vac
HOT
COM
+
1
2
5
3
4
EF
EF1
Johnson Controls Unitary Products

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunline magnum wj180Sunline magnum wj300

Table of Contents