Maintenance Requirements - Rheem Solar Hiline 52D Series Owner's Manual And Installation Instructions

Open circuit
Table of Contents

Advertisement

MINOR MAINTENANCE EVERY SIX MONTHS
It is recommended minor maintenance be performed every six (6) months. Minor maintenance can be
performed by the dwelling occupant.
The minor maintenance includes:
If readily and safely accessible, operate the easing lever on the temperature pressure relief valve. It is
very important the lever is raised and lowered gently. Refer to
If the relief valve lever is not readily and safely accessible, contact Rheem Service or their nearest
Accredited Service Agent. Do not attempt to climb onto a non-trafficable roof to operate the relief valve
lever.
Warning: Water discharged from the temperature pressure relief valve drain line will be hot. Exercise
care to avoid any splashing of water by standing clear of the drain line's point of discharge when operating
the valve's easing lever.
If readily and safely accessible, operate the easing lever on the expansion control valve. It is very
important the lever is raised and lowered gently. Refer to
If the relief valve lever is not readily and safely accessible, contact Rheem Service or their nearest
Accredited Service Agent. Do not attempt to climb onto a non trafficable roof to operate the relief valve
lever.
MAJOR SERVICE EVERY FIVE YEARS
It is recommended a major service be conducted on the water heater every five (5) years. If an anode
replacement is conducted sooner than a major service, then the major service should coincide with the
replacement.
Warning: Servicing of a water heater must only be carried out by a qualified person. Phone Rheem Service
or their nearest Accredited Service Agent.
Note: The major service and routine replacement of any components, such as the anode and relief valves,
are not included in the Rheem warranty. A charge will be made for this work. Only genuine replacement parts
should be used on this water heater.
The major service includes the following actions:
Replace the temperature pressure relief valve.
Inspect and flush the expansion control valve. If required, replace the valve.
Inspect and if required, replace the anode.
If the anode is not replaced, it should be replaced within three (3) years of this service. Refer to
Inspection and Replacement"
Drain and flush the solar storage tank of sediment build-up if required.
Flush the solar collectors.
Check the booster heating unit for excessive calcium build-up or corrosion and replace if necessary.
Visually check the unit for any potential problems, e.g. broken glass, excessive dust and dirt build-up,
shading.
Clean the collector glass.
Check the condition of the pipe insulation, if fitted, on the solar hot and solar cold pipes. Replace or make
good if required.
Inspect all connections.

MAINTENANCE REQUIREMENTS

on page 17.
"Relief Valves"
"Relief Valves"
14
on page 8.
on page 8.
"Anode

Advertisement

Table of Contents
loading

Table of Contents