Download Print this page

Tools And Materials Required - Kohler S-TRAP K-3869T Installation Instructions Manual

Vitreous china skirted trapway one-piece toilet

Advertisement

TOOLS AND MATERIALS REQUIRED

(Not supplied)
·
254mm (10") adjustable wrench
·
305mm (12") pipe wrench
·
Metal file (file cut)
·
Tape measure
·
Tubing cutter
·
Level
·
Hacksaw
·
Putty knife
·
Screwdriver
·
Toilet gasket (wax seal)
·
Toilet T-bolts (2), 8mm (5/16") diameter
·
Toilet supply shut-off valve, 10mm(3/8 ) recommended
NOTICE:
If the existing toilet does not have a supply shut-off
valve below the tank, install one before installing the new
toilet.
Reference Value
Finished Wall
Finished Wall
1195897-T01-C
"
749
C L
OF OUTLET
305
749
400
Kohler reserves the right to change marked dimensions without prior notice.
·
254mm
·
305mm
·
·
·
·
·
·
·
·
·
8mm T
·
K-3869T/K-3869T-S
392
708
390
67
194
K-4165T/K-4165T-S
392
708
390
67
194
Fig.#1
1
-2-
2
10mm
FRONT OF BOWL
FRONT OF BOWL
Unit: mm
:

Advertisement

loading

This manual is also suitable for:

S-trap k-3869t-sS-trap k-4165tS-trap k-4165t-s