Kohler PILLOW TALK POWER LITE K-3379 Installation Instructions Manual

Kohler PILLOW TALK POWER LITE K-3379 Installation Instructions Manual

Vitreous china toilet
Hide thumbs Also See for PILLOW TALK POWER LITE K-3379:
Table of Contents

Advertisement

Available languages

Available languages

Quick Links

1. BEFORE YOU BEGIN
A. HOW TO USE THESE INSTRUCTIONS
Please read these instructions carefully to familiarize yourself with
the required tools, materials, and installation sequences. Follow the
sections that pertain to your particular installation. This will help you
avoid costly mistakes. In addition to proper installation, read all
operating and safety instructions.
B. INSTALLER HAZARD NOTIFICATION
DANGER: Risk of electrical shock. Connect only to a
properly grounded, grounding-type receptacle, protected by
a Ground-Fault Circuit- Interrupter (GFCI).
DANGER: Risk of injury or product damage. Handle
vitreous china products very carefully. Vitreous china can
break and chip if you overtighten bolts and nuts.
NOTICE:
Follow all local plumbing and electrical
codes.
D. PRODUCT REQUIREMENTS
S
Toilet should be installed with a 3/8" shut-off valve.
S
Since all toilets do not have the same supply rough-in, you
may have to change the location of the supply stop to install
this toilet.
S
Closet flange must be 12" (30.5cm) on-center from wall.
S
Electrical service requirements: dedicated 120 VAC, 15A, 60
Hz. (circuit protected by Class A GFCI.)
F. MATERIALS REQUIRED
S
3/8" shut-off valve
S
Closet flange
S
Toilet T-bolts (2) 5/16" diameter
S
Toilet gasket (wax seal)
A
1007265-2-
R
Español, Página 9
Français, Page 17
1 1
PILLOW TALK POWER LITE
VITREOUS CHINA
All information in this manual is based on the latest product
information available at the time of publication. Kohler Co. reserves
the right to make changes in product characteristics, packaging, or
availability at any time without notice.
These instructions contain important care, cleaning, and warranty
information – please leave for the consumer.
C. PRODUCT PROPERTIES
S
One-piece vitreous china toilet.
S
Water depth from rim is 6-1/2" (16.5cm).
S
2-1/4" (5.7cm) passageway.
S
3' (91.4cm) electrical cord length.
S
For roughing-in and overall dimensions, See
S
Fixture dimensions are nominal and conform to tolerances
by ANSI/ASME standards (A112.19.2M).
E. ORDERING INFORMATION
Pillow Talk Power Lite Toilet
When specified:
floor bolts (pr.)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3/8" supply
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NOTE: For service parts ordering information, see separate
Service Parts document enclosed with product.
G. TOOLS REQUIRED
S
10" (25.4cm) adjustable wrench
S
12" (30.5cm) pipe wrench
S
Tubing cutter
S
Level
S
Putty knife
S
Hacksaw/metal file (for shortening T-bolts)
S
Screwdriver
NOTE: Site preparation may require additional tools.
TOILET
Fig. #3 .
. . . . . . . . . . . . . . . . . . . . .
K-3379
21401
K-7638
E2001 Kohler Co.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PILLOW TALK POWER LITE K-3379 and is the answer not in the manual?

Questions and answers

Summary of Contents for Kohler PILLOW TALK POWER LITE K-3379

  • Page 1 All information in this manual is based on the latest product Please read these instructions carefully to familiarize yourself with information available at the time of publication. Kohler Co. reserves the required tools, materials, and installation sequences. Follow the the right to make changes in product characteristics, packaging, or sections that pertain to your particular installation.
  • Page 2: Site Preparation

    Fig. #2 C. ROUGH-IN PLUMBING Turn off water supply. Install or relocate supplies and outlets as necessary to conform to roughing-in dimensions. See Fig. #3 . For shut-off valve location, see Fig. #4 . 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 3 Locate supply shut-off valve so it is 2-5/8” (6.7cm) above the floor 2-5/8” line and 5-1/8” (13cm) to the left of the centerline of the closet flange. (6.7cm) 12” (30.5cm) Fig. #4 Install new 5/16” diameter T-bolts. T-Bolts Closet Flange Fig. #5 Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 4: Installation

    CAUTION: Risk of product damage. Do not lift or rock toilet after placement. A new gasket must be reapplied if you break the watertight seal. Apply full body weight to toilet rim to set seal. Closet Flange T-Bolts Fig. #7 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 5 Carefully bend supply stop tubing to fit. Measure for required Compression Tubing penetration into supply stop. Cut and de-burr tubing. Place connection hardware onto tubing as shown. Hand-tighten coupling Coupling Nut Ferrule nut first and then the compression nut. Supply Stop Fig. #10 Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 6 Turn shut-off valve on. Check for leaks. Check all bowl and tank connections for leaks for several days. The nuts on the T-bolts may also require re-tightening. Check Here For Leaks Shut-off Valve Check Here For Leaks Fig. #12 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 7 Long Flush (1.6 gpf (6 lpf)) Short Flush (1.1 gpf (4.2 lpf)) Fig. #15 K. TROUBLESHOOT AS NECESSARY To troubleshoot any problems that may occur, see the owner’s manual also packed with the product. Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 8: Important Consumer Information

    (calcium hypochlorite) can seriously damage fittings in the tank. This damage can cause leakage and property damage. Kohler Company shall not be responsible or liable for any tank fitting damage caused by the use of cleaners containing chlorine (calcium hypochlorite).
  • Page 9: Instrucciones De Instalación

    Kohler Co. se reserva el derecho de efectuar cambios instalación. Siga las secciones correspondientes a su instalación en las características del producto, empaque o disponibilidad en particular.
  • Page 10: Preparación Del Sitio

    Instale o reubique las salidas y los suministros según sea necesario para cumplir con las dimensiones del diagrama de instalación. Consulte la Fig. #3 . Para la ubicación de la llave de paso, consulte la Fig. #4 . 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 11 5-1/8” (13cm) a la izquierda del centro de la 12” brida. (30,5cm) Fig. #4 Instale dos pernos en T nuevos de 5/16” de diámetro. Pernos en T Brida del inodoro Fig. #5 Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 12: Instalación

    Si se rompe el sello hermético, se deberá instalar uno nuevo. Aplique todo el peso del cuerpo en los bordes del inodoro para afirmar el sello. Brida del inodoro Pernos en T Fig. #7 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 13 Corte y desbarbe la tubería. Coloque el material Casquillo de ferretería en la tubería, como aparece en la ilustración. Fije a Llave de paso mano la tuerca de acoplamiento primero y luego la tuerca de compresión. Fig. #10 Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 14 Es posible que se deba ajustar las tuercas y los pernos en T nuevamente. Revise que no haya fugas aquí Llave de paso Revise que no haya fugas aquí Fig. #12 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 15 Verifique que ambas descargas funciónen correctamente. Descarga larga (1,6 gpd (6 lpd) Descarga corta (1,1 gpd (4,2 lpd) Fig. #15 K. PROBLEMAS DE REPARACIÓN Utilice la guía del propietario incluida con el inodoro para los problemas de reparación. Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 16 Esto puede causar fugas y daños a la propiedad. Kohler Co. no se hace responsable por concepto de daños ocurridos a los accesorios causados por el uso de limpiadores que contienen cloro (hipocloruro de calcio).
  • Page 17: Notice D'installation

    Veuillez lire avec attention cette notice pour connaître les outils et au moment d’aller sous presse. La société Kohler se réserve le droit matériaux requis, ainsi que les étapes d’installation. Suivez les d’apporter des modifications aux caractéristiques, conditionnement...
  • Page 18: Préparation Du Site

    Fermer l’arrivée d’eau. Installer ou déplacer les robinets d’arrêt et les sorties au besoin, selon le diagramme de raccordement. Voir la Fig. #3 . Pour l’emplacement du robinet d’arrêt, voir la Fig. #4 . 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 19 5-1/8 po (13 cm) à gauche de l’axe de la bride du sol. 12 po (30,5cm) Fig. #4 Installer les boulons à T de 5/16 po dia. Boulons à T Bride de sol Fig. #5 Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 20 Si le joint étanche se brise, il faut remplacer l’anneau en cire. Appliquer une pression de tout son poids de corps répartie sur le rebord de la cuvette pour fixer le joint. Bride de sol Boulons à T Fig. #7 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 21 Écrou de Collet à raccordement Couper et ébarber le tube. Raccorder les pièces au tube, tel compression qu’illustré. Serrer l’écrou de raccordement et l’ecrou à compression à la main. Robinet d’arrêt Fig. #10 Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 22 Il se peut que les écrous sur les boulons à T nécessitent être serrés à nouveau. Vérifier ici s’il y a des fuites Robinet d’arrêt Vérifier ici s’il y a des fuites Fig. #12 1007265-2- Kohler Co., Kohler, WI U.S.A.
  • Page 23 S’assurer du fonctionnement des deux opérations. Chasse longue (1,6 gpc (6 lpc)) Chasse courte (1,1 gpc (4,2 lpc)) Fig. #15 K. RÉPARER AU BESOIN Pour résoudre les problèmes possibles, voir le manuel du propriétaire qui accompagne le produit. Kohler Co., Kohler, WI U.S.A. 1007265-2-...
  • Page 24 Revoir d’abord la notice d’installation pour s’assurer d’une installation correcte. Pour toute assistance additionnelle, contactez notre département de service à la clientèle. Vous pouvez aussi nous joindre sur notre site Web à l’adresse donnée ci-dessous. Aux É.-U., composer le 1-800-4-KOHLER Au Mexique, composer le 001-877-680-1310 Au Canada, composer le 1-800-964-5590 www.kohlerco.com...

Table of Contents