Completing The Test; Station Communication; Multiple Command And Transmit Multicmdrcv / Multicmdsnd - ABB RELION 650 Series Commissioning Manual

Hide thumbs Also See for RELION 650 Series:
Table of Contents

Advertisement

Section 10
Testing functionality by secondary injection
1.
Repeat the above test steps 1 to 2.
2.
Set
at their rated value till 1 minute.
3.
Check the MAXPAFD and MAXPRFD outputs after 1 minute and compare it with last 1 minute
average power values.
4.
Increase either three phase current or voltage above the last 1 minute value.
5.
After 1 minute check the MAXPAFD and MAXPRFD whether it is showing the last 1 minute
average power value as maximum.
6.
Next 1 minute cycle reduce the current or voltage below previous value.
7.
Check after 1 minute whether the MAXPAFD and MAXPRFD outputs are retaining the old
maximum value.
8.
Similarly the testing can be done for MAXPAFD and MAXPRFD outputs by changing the
power inputs directions through direction settings.
Verification of EAFALM & ERFALM outputs
1.
Repeat the above test steps 1 to 2.
2.
Set
at their rated value till 1 minute.
3.
Ensure that the active and reactive energy values are less than the
setting default values respectively.
4.
Check that EAFALM and ERFALM are low.
5.
Increase the supply currents or voltage in next 1 minute cycle such that the active or
reactive energy values are greater than the
respectively.
6.
Check that EAFALM and ERFALM are high after 1 minute.
7.
Similarly the testing can be done for EARALM and ERRALM outputs by changing the power
inputs directions through direction settings.
10.13.2.2

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
10.14

Station communication

10.14.1
Multiple command and transmit MULTICMDRCV /
MULTICMDSND
The multiple command and transmit function (MULTICMDRCV / MULTICMDSND) is only
applicable for horizontal communication.
Test of the multiple command function block and multiple transmit is recommended to be
performed in a system, that is, either in a complete delivery system as an acceptance test
(FAT/SAT) or as parts of that system, because the command function blocks are connected in
a delivery-specific way between bays and the station level and transmit.
Command and transmit function blocks included in the operation of different built-in
functions must be tested at the same time as their corresponding functions.
120
tEnergy setting as 1 minute and supply the IED with three phase currents and voltages
tEnergy setting as 1 minute and supply the IED with three phase currents and voltages
EALim and ERLim setting default values
TESTMODE setting to Off .
1MRK 506 366-UEN A
EALim and ERLim
M13906-301 v5
SEMOD53595-1 v1
SEMOD172432-5 v3
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rel650

Table of Contents