INSTALLATION
HC SERIES BOILERS HC 13-50, HC 15-95, HC 15-96, HC 20-125, HC 33-160
Figure 6: Vertical Concentric Termination - Two Kits
Figure 7: Vertical Concentric Termination - Single Kit
1.4.6 Sidewall Vent Termination
DIRECT VENT - TWO PIPE
Sidewall direct vent applications shall be vented as follows:
Both the inlet and exhaust terminations should normally be located on the
same plane (side) of the building.
The exhaust outlet is to be placed so as to reach 12" minimum above the
down-turned intake - to avoid intake re-ingestion of exhaust gases.
The elevation of both pipes can be raised in "periscope style" after passing
through the wall, then configured as in Figure 8, to gain required clearance.
1-9