Hydraulic Connections; Pump; 5.14.1 Technical Data; 5.14.2 Pump Priming - Riello 20032946 Installation, Use And Maintenance Instructions

Dual fuel gas oil/ gas burners
Table of Contents

Advertisement

5.13

Hydraulic connections

The pumps are equipped with a by-pass that connects return line
with suction line. The pumps are installed on the burner with the
by-pass closed by screw 6)(Fig. 19).
It is therefore necessary to connect both hoses to the pump.
The pump will break immediately if it is run with the return line
closed and the by-pass screw inserted.
Remove the plugs from the suction and return connections of the

pump.

Insert the hose connections with the supplied seals into the con-
nections and screw them down.
Take care that the hoses are not stretched or twisted during in-
stallation.
Route the hoses through the holes in the plate, preferably using
those on the right side, (Fig. 20):
 unscrew the screws 1), now divide the insert piece into its
two parts 2) and 3) and remove the thin diaphragm blocking
the two passages 4).
 Install the hoses where they cannot be stepped on or come
into contact with hot surfaces of the boiler and where they do
not hamper the opening of the burner.
5.14
Pump
In case of use with gas oil containing up to 10%
Bio blend, it will be essential to use flexible oil
lines suitable for bio fuel use.
Please contact Riello for further information.
WARNING
1
Suction
2
Return
3
Pressure gauge attachment
4
Vacuum meter attachment
5
Pressure governor

5.14.1 Technical data

Suntec ALV65B
Min. delivery rate at 12 bar pressure
Delivery pressure range
Max. suction depression
Viscosity range
Max. gas oil temperature
Max. suction and return pressure
Pressure calibration in the factory
Filter mesh width
20033283
Installation
D868
Fig. 21
G 1/4"
G 1/4"
G 1/8"
G 1/8"
kg/h
67
bar
4 - 18
bar
0.45
2
mm
/s (cSt)
2 - 12
°C
60
bar
2
bar
12
mm
0.15
Tab. H
20
Now connect the other end of the hoses to the suction and return
lines by using the supplied nipples.

5.14.2 Pump priming

Before starting the burner, make sure that the
tank return line is not clogged.
Obstructions in the line could cause the seal-
WARNING
ing organ located on the pump shaft to break.
(The pump leaves the factory with the by-pass
closed).
Also check to make sure that the valves located on the suc-
tion line are open and that there is sufficient fuel in the tank.
For self-priming to take place, one of the screws 3)(Fig. 21)
of the pump, must be loosened in order to bleed off the air
contained in the suction line.
Start the burner by closing the control devices, with switch
1)(Fig. 22) in the "ON" position and with switch 22)(Fig. 5 at
page 12) in the "OIL" position.
The pump can be considered to be primed when the gas oil
starts coming out of the screw 3)(Fig. 21). Stop the burner:
switch 1)(Fig. 22) set to "OFF" and tighten the screw 3).
Burner
Off
On
D469
The time required for this operation depends upon the diameter
and length of the suction tubing.
If the pump fails to prime at the first starting of the burner and the
burner locks out, reset the burner, and then repeat the starting
operation.
Do not illuminate the cell UV or the burner will lock out.
GB
D1136
1
2
Stage
st
1
nd
2
Fig. 20
Fig. 22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rls 38Rls 50684t1685t1686t1Rls 28 ... Show all

Table of Contents