3. Installation and commissioning
3.1 Handling
Handling
1)
Protect the refrigerator in moving it,Same as shown
as left photo, please move it by handcart with cushion
2)
Remove all packing materials and bottom cushion,
the move into house for placement
3)
After moving it to appropriate location, wait for 2 hou
rs before power on.
3.2 Door Disassembly and Assembly
When the whole refrigerator cannot enter the room, the door can be
assembled after entering separately.
3.3 Installation location
Installation location
Please select a ventilated place to place the refrigerator,
and reserve space according to the recommended size
in the picture, which is conducive to heat dissipation,
performance improvement and energy consumption
reduction.
Service Manual_2020-V1.0
9
d, then
disassemble