Integrated Panel Installation - U-Line U-3060FZRINT-00A User Manual & Service Manual

Table of Contents

Advertisement

USER GUIDE
SAFETY • INSTALLATION & INTEGRATION • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE

Integrated Panel Installation

1. Fully open door/drawer.
2. Starting at corner, pull
gasket away from door/
drawer.
3. Continue to pull gasket
free from gasket channel.
4. Upon removal, lay gasket down on a flat surface.
NOTICE
If the door/drawer houses the display, make
certain the display cable remains securely
seated in the inner door channel, see below.
Display
Cable
Inner Door
Channel
5. The panel should be aligned with the outside edge
(opposite the hinge, if equipped) and high enough to
align with the highest point in the door/drawer.
Align Top Of Panel With Highest Point Of Door/Drawer
NOTICE
Due to differences in floor construction or
surrounding cabinetry, the panel may not sit
flush with the top of the door/drawer.
6. Secure integrated
7. Using a 7/64"
NOTICE
It is important to ensure that all drilled holes are
drilled to the correct depth in order to avoid
Align Panel
splits in the wood when hardwood is installed.
Against
Door/Drawer
Edge First
8. Locate 6 of the #6x 1-1/2" (38 mm) screws provided
22
Panel
panel to door/
drawer using
clamps. A robust
tape may also be
used. U-Line
recommends the
Door/Drawer
use of bar clamps
to secure the panel
to the door/drawer.
If using tape, be
certain the tape will
not damage panel
finish upon
removal.
(3 mm) drill bit,
drill 6 pilot holes
into the wood panel
1/2" (12 mm) deep using the holes in the door/drawer
frame as a guide.
with your unit.
Door/Drawer
Bar
Clamp
Wood
Panel
Bar
Clamp
Integrated Panel Installation 1

Advertisement

Table of Contents
loading

Table of Contents