3.5.2 Install the Ground Spike
The constant Base Station position is marked by the Ground Spike, a rigid piece of plastic inserted into the ground.
The Ground Spike provides a reference spot for the Prism Pole placement to keep the Base Station position
consistent and your fields accurate every time.
Install the Ground Spike:
1.
Position the sharp end at the marking point on the ground.
2.
Hit the flat top of the Ground Spike with a rubber mallet.
3.
Drive the Ground Spike into the dirt until the flat top is even with the ground.
The ground shouldn't be too hard or too soft when you drive the Ground Spike to avoid breaking the Spike
or losing your position.
116
Product Manual - Turf Tank One+
Installation and Operation
Need help?
Do you have a question about the One+ and is the answer not in the manual?
Questions and answers