Mitsubishi Heavy Industries SRC25ZMP-S Technical Manual page 57

Table of Contents

Advertisement

Cooling
Heat exchanger
sensor
Heating
Cooling
Ourdoor air
temperature sensor
Heating
Discharge pipe
All modes
sensor
(9) Checking the indoor electrical equipment
(a) Indoor PCB check procedure
Is there voltage between terminal
blocks ① and ② ? (AC 220/230/240
V)
YES
Is the fuse burnt out? (3.15 A)
YES
Is the voltage between terminal
blocks ② and ③ oscillating between
DC 0 and 20V?
YES
Indoor electrical components
are normal.
(b) Indoor unit fan motor check procedure
1) Indoor PCB output check
DC several V
(4~6 V)
CNU
2) Fan motor resistance check
Measuring point
①  −  ③
④  −  ③
NO
Inspect power source
for outdoor unit.
NO
Replace fuse.
NO
Replace indoor PCB.
(–)
GND
DC15V
FM
I
Resistance when normal
k
Defrosting is performed for 10 minutes at approx. 35 (model SRK35:45) minutes.
Defrosting is performed for 10 minutes at approx. 35 (model SRK35:45) minutes.
DC 308~336V
Indoor PCB
56
-
-
'13 • SRK-T-140
① ④
Measuring
Resistance when
point
normal
①  −  ③
④  −  ③
⑤  −  ③
⑥  −  ③

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk35zmp-sSrk45zmp-sSrk25zmp-sSrc35zmp-sSrc45zmp-s

Table of Contents