ELECTRICAL WIRING WORK (2/3)
• Please fix power supply wiring, transmission wiring, and earth wiring by clamp material as below figure.
RZCA125AV16, RZCA140AV16
All connection terminals should be
insulated by, for example, attached
insulating sleeves.
( Direction for pulling out the wiring )
• Plug the piping through-hole with putty or
insulating material (field supply) so as not to
leave any gap and prevent entry of small
animals.
• Use the knock hole, on the front and side for the
conduit (composite) operation.
*
When punching knock hole remove pipe outlet
plate from unit and open knock hole
When wiring, using single core wires for the
earth wiring, tie the power supply wiring and the
earth wiring by clamp material as shown in the
right figure.
Lt:i.
Do not connect power supply to
terminal block of transmission wiring.
All system may get damaged.
Earth wirin
Transmission Power supply
wiring
wiring
Secure the power supply wiring and the transmission
wiring to the stop valve attachment plate using the
clamping material so that ii does not move.
)
Terminal plate
Transmission
wiring and
earth wiring
Power supply
wirin
44
Earth wiring
Clamp
accessories