Installation; General - Pace ARM-EVAC 250 Operation & Maintenance Manual

Fume extraction systems
Hide thumbs Also See for ARM-EVAC 250:
Table of Contents

Advertisement

ARM-EVAC® 250 & 200 SYSTEMS

INSTALLATION

GENERAL

The Arm-Evac 250 and Arm-Evac 200 have been designed with maximum installation flexibility in
mind. A number of configurations may be used. (See the "Configurations" section.) The following
are recommended guidelines for setting up your system. If you have any specific questions that this
section does not cover please consult your PACE Representative or call PACE directly.
1. Placement
There are 3 major considerations that need to be addressed for proper placement of the central
filtration unit.
• Exhaust Port: This is located on the back of the filtration unit, next to the power inlet. When
positioning the unit, make sure that the exhaust port is not blocked or that airflow from the exhaust
port is not restricted in any way.
• Unit Location: The filtration unit should be positioned so that it will not block aisleways or impede
normal operating traffic or material handling pathways. It is important to position the unit to allow
for proper clearance to remove the filter access cover and replace the filter as needed.
• Proximity to the work area: The filtration unit should be placed as close to the work area as
possible. If using a flex hose, it is advantageous to keep the length of flex hose as short as
possible. Do not kink or create any sharp bends in the flex hose, as this will reduce airflow.
2. Power
The Arm-Evac 250/200 will plug into a standard 110 volt or 230 volt electrical outlet, depending on
the model you purchased. A line cord is provided with each system. Be sure the unit you have is
rated for the intended power supply.
Caution
Failure to supply the correct voltage to the unit will result in damage to the motor.
3. Self-Calibration Procedure
IMPORTANT
This procedure must be performed on the Arm-Evac 250 before initial
operation.
4. Filters
Before operating the unit, make sure the filters are correctly positioned. The pre-filter is always
located on top, and the direction of airflow is clearly marked on the filter cartridge. Airflow is
always in a downward direction for the Arm-Evac 250/200.
5. Inlet Caps
If an inlet port is not connected to a collection device, it must be covered with the inlet cap
provided.
Orion Industry – 16 chemin de la Guy – 91160 Ballainvilliers – France - Tel +33 1 69 34 53 11
Page 10 sur 18
E mailto:info@orion-industry.com- W
http://www.orion-industry.com/

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arm-evac 200

Table of Contents