Typical Installation; Physical Installation - Little Giant BSWC50 Owner's Manual

Sewage pump
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Typical Installation

INSTALLATION
Typical Installation
1
Switch Power
2
Pump Power
3
Gate Valve

Physical Installation

1. Install the pump in a suitable gas-tight basin at least 18 inches (45.7 cm) in diameter and 30 inches
(76.2 cm) deep, vented in accordance with local, state, and federal plumbing codes.
2. Place the pump-basin assembly on a hard, level surface.
• Never place pump directly on clay, earth, or gravel surfaces.
• Secure the pump so the starting torque does not cause the pump to contact anyone or anything.
3. Install discharge piping.
• Do not use piping smaller than the pump discharge.
• Use ABS, PVC, polyethylene, or stainless steel pipe.
4. Install a full-flow check valve in the discharge line horizontally to prevent back flow of liquid into the
basin.
• A ball check valve is recommended.
NOTE: If installed vertically, solids may settle in the valve and prevent it from opening at start-up.
4
1
2
3
4
6
8
4
Check Valve
5
Vent
6
Discharge
5
9
7
7
8
9
Gas Tight Basin
Intake
Air Bleed Hole

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bswc50t

Table of Contents