Package Contents; Connecting / Disconnecting; Preparation For Use - NSK PTL-CL-LED Operation Manual

Coupling
Hide thumbs Also See for PTL-CL-LED:
Table of Contents

Advertisement

Available languages

Available languages

Package Contents

3
Part Name
1
KCL Coupling Wrench
2
KCL O-ring Set
4
Quantity
Remarks
1
KCL-LED
1
KCL-LED

Preparation for Use

4
4–1 Connecting / Disconnecting
4–1–1 Connecting the Hose
PTL-CL-LED, PTL-CL-LED III, PTL-CL-FV-T,
FM-CL-M4, FM-CL-M4-T, QD-J B2/B3, QD-J
M4
To connect, align the pipes of the coupling with the pipe
1
holes of the hose, then insert them carefully and firmly,
and tighten the hose nut securely (1) (Fig. 1).
Hold the non-rotating part and connect to the hose
2
securely and make sure there is no looseness in the
hose connection (2) (Fig. 2). (When checking, do not
hold the ring as it will rotate.)

Advertisement

Table of Contents
loading

Table of Contents