If pump down is needed in case of dismantling or relocating the
system, see
"13.2 To pump down" on page 85
7.7.6
To fix the fluorinated greenhouse gases
label
1 Fill in the label as follows:
Contains fluorinated greenhouse gases
RXXX
1
=
f
GWP: XXX
2
=
2
1
+
1
2
=
GWP × kg
=
1000
a
If a multilingual fluorinated greenhouse gases label is
delivered with the unit (see accessories), peel off the
applicable language and stick it on top of a.
b
Factory refrigerant charge: see unit name plate
c
Additional refrigerant amount charged
d
Total refrigerant charge
e
Greenhouse gas emissions of the total refrigerant charge
expressed as tonnes CO
f
GWP = Global warming potential
NOTICE
In Europe, the greenhouse gas emissions of the total
refrigerant charge in the system (expressed as tonnes CO
equivalent) is used to determine the maintenance intervals.
Follow the applicable legislation.
Formula to calculate the greenhouse gas emissions:
GWP value of the refrigerant × Total refrigerant charge [in
kg] / 1000
2 Fix the label on the inside of the outdoor unit near the gas and
liquid stop valves.
7.8

Connecting the water piping

7.8.1

About connecting the water piping

Before connecting the water piping
Make sure the outdoor and indoor unit are mounted.
Typical workflow
Connecting the water piping typically consists of the following
stages:
1
Connecting the recirculation piping.
2
Connecting the water piping to the indoor unit (including the
installation of the domestic hot water tank kit).
3
Connecting the pressure relief valve of the domestic hot water
tank to the drain.
4
Filling the water circuit.
5
Filling the domestic hot water tank.
6
Insulating the water piping.
7.8.2
Precautions when connecting the water
piping
INFORMATION
Also read the precautions and requirements in the
following chapters:
▪ General safety precautions
▪ Preparation
7.8.3

To connect the recirculation piping

Prerequisite: Only required if you need recirculation in your system.
ERLQ004~008CA + EHVH04+08SU18+26CB6W
Daikin Altherma – Low temperature split
4P449978-1B – 2018.07
for more details.
a
kg
b
kg
c
d
kg
e
tCO
eq
2
equivalent
2
2
1 Loosen and remove the 4 screws that fix the top panel.
2 Remove the top panel from the unit.
3 In case of a unit with a tank capacity of 180  l, remove the
expansion vessel.
4 Remove the top insulation.
5 Cut out part (c) from the top insulation.
Tank capacity
180 l
260 l
6 Connect the recirculation piping to the recirculation connection
(b) and route the piping through the hole at the backside of the
unit (a).
A
a
b
a
Piping intake hole
b
Recirculation connection
c
Cut-out location
7 Reattach the top insulation and the expansion vessel.
7.8.4

To connect the water piping

NOTICE
Do NOT use excessive force when connecting the piping.
Deformation of the piping can cause malfunctioning of the
unit.
INFORMATION
The water piping needs to comply with section G3 of the
Building Regulations. To facilitate compliance, domestic
hot water tank kits EKVSU180A and EKVSU260A are
available. The instructions below include the installation of
these tank kits. If they are NOT used, at all times make
sure that the water piping complies with the applicable
legislation.
7 Installation
Cut out position
Left OR right
Backside
180 l
A
260 l
180°
Installer reference guide
c
39

Advertisement

Table of Contents
loading

Table of Contents