HP HPE Alletra 2140 Hardware Manual page 102

Table of Contents

Advertisement

1
Thumbscrew
2 Controller release lever
8. Move the System Info label from the old chassis to the new chassis.
a) With the System Info label partially extended, slide a flat card over the label to depress the left and right corner tray
lock tabs on the chassis.
b) Pull out the System Info label and transfer it to the new chassis.
9. Connect the network cables first, then the cables for expansion shelves, followed by the power cords to the array, and
then return the front bezel.
10. Verify that the array is powered on.
The array powers up automatically when the power cables are connected. If the array did not power on, contact HPE
Support.
11. Return the old chassis as directed on the RMA work order.
Documentation Feedback: doc-feedback-hpe-storage@hpe.com
3
Controller
Maintenance Procedures 102

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents