Harvia Virta Pro HL200E Instructions For Installation And Use Manual

Harvia Virta Pro HL200E Instructions For Installation And Use Manual

Electric sauna heater

Advertisement

Quick Links

HL200E
Instructions for Installation and Use of Electric Sauna Heater
20032023 / Y05-0933 B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Virta Pro HL200E and is the answer not in the manual?

Questions and answers

Summary of Contents for Harvia Virta Pro HL200E

  • Page 1 HL200E Instructions for Installation and Use of Electric Sauna Heater 20032023 / Y05-0933 B...
  • Page 2: Table Of Contents

    These instructions for installation and use are in- tended for the owner or the person in charge of the sauna, as well as for the electrician in charge of the electrical installation of the heater. After completing the installation, the person in charge of the installa- tion should give these instructions to the owner of the sauna or to the person in charge of its operation.
  • Page 3: Instructions For Use

    1. INSTRUCTIONS FOR USE 1.1. Piling of the Sauna Stones If the heater output is suitable for the sauna room, The piling of the sauna stones has a great effect on it will take about an hour for a properly insulated the functioning of the heater (figure 1).
  • Page 4: Instructions For Bathing

    Water properties Effect Recommendation Humus concentration Colour, taste, precipitates <12 mg/l Iron concentration Colour, odour, taste, precipitates <0,2 mg/l Manganese (Mn) concentration Colour, odour, taste, precipitates <0,10 mg/l Hardness: most important substances are Precipitates Mg: <100 mg/l magnesium (Mg) and lime, i.e. calcium (Ca) Ca: <100 mg/l Chloride-containing water Corrosion...
  • Page 5: Sauna Room

    2. SAUNA ROOM Figure 2. 2.1. Sauna Room Structure NOTE! Check from the fire authorities which parts A. Insulation wool, thickness 50–100 mm. The of the firewall can be insulated. Flues which are in sauna room must be insulated carefully so that use must not be insulated.
  • Page 6: Sauna Room Ventilation

    min. 1000 mm 360° min. 500 mm 180° Figure 3. 2.2. Sauna Room Ventilation 2.4. Sauna Room Hygiene The air in the sauna room should change six times Bench towels should be used during bathing to per hour. Figure 3 illustrates different sauna room prevent sweat from getting onto the benches.
  • Page 7: Instructions For Installation

    3.2. Place and Safety Distances The minimum safety distances are described in 3.4.1. Suitable control units figure 4. It is absolutely necessary to install the Harvia Xenio CX45J + LTY45J • heater according to these values. Neglecting them causes a risk of fire.
  • Page 8 Opening the cover of the service hatch Connections of the heater 1. Connection box 2. Connection cable 3. Junction box HL200E I circuit 4. Junction box HL200E II circuit Replacing the Heating Elements Figure 5. <150 >150 50-150 Figure 6. Installing the sensor (all dimensions in millimeters)
  • Page 9: Electrical Connections

    3.5. Electrical Connections 3.5.1. Electric Heater Insulation Resistance The heater may only be connected to the When performing the final inspection of the electrical electrical network in accordance with the cur- installations, a “leakage” may be detected when rent regulations by an authorised, professional measuring the heater’s insulation resistance.
  • Page 10: Spare Parts

    4. SPARE PARTS HL200E Y10-0006I (3500W / 208V) x 6 We recommend to use only the manufacturer’s spare parts.
  • Page 12 GLOBAL: P.O.Box 12 | Teollisuustie 1-7 | 40951 Muurame | FINLAND | +358 207 464 000 | harvia@harvia.fi | www.harvia.com CENTRAL EUROPE: Sentiotec GmbH | Division of Harvia Group | Wartenburger Straße 31, A-4840 Vöcklabruck T +43 (0) 7672/22 900-50 | F -80 | info@sentiotec.com | www.sentiotec.com...

Table of Contents