X1-hybrid 3kW-5kW
Inverter x1
Bracket x1
Battery connectors
(positive x1, negative x1)
Version I
DC pin connectors
(positive x2, negative x2)
AC terminal x8 *
User manual x1
Quick installation guide x1
Warranty card x1
AC terminal x8 *:
4 6AWG AC terminals and 4 10AWG AC terminals for Version I
4 10AWG AC terminals and 4 8AWG AC terminals for Version E and Version C
EPS Connection(for I version and E version )
I
EPS wiring diagram
I Version inverter:EPSfunctioncanbeonlybeachievedautomatically.
Do not required for Changeover Switch.
I Version
Auto
Do not required for Changeover Switch
wired by manufactor
I Version
required for installation
PV2+
PV1+
RCMB
PV2 -
PV1 -
+
Battery
-
L
I
I
L
EPS
AC
EPS breaker: ≥32A
RCD: type A
RCD
RCD
L
EPS Load
Load
E Version inverter:EPSfunctioncanbeachieved manually or automatically.
E Version
Manual
Required for Changeover Switch
E Version
wired by manufactor
PV2+
PV1+
RCMB
PV2 -
PV1 -
+
Battery
-
L
PE
L
EPS
AC
EPS breaker: ≥32A
changeover device( DPDT )
RCD
Load
RCD: type A
RCD
L
EPS Load
E Version
Auto
Required for Changeover Switch
E Version
wired by manufactor
PV2+
PV1+
required for installation
RCMB
PV2 -
PV1 -
+
Battery
-
L
PE
L
EPS
AC
EPS breaker: ≥32A
Contactor Device
Contactor
RCD
Load
RCD: type A
RCD
L
EPS Load
Please contact our sales for any compatible contactor purchase requirement .
Expansion tubes x4
DC connectors
Expansion screws x4
(positive x2, negative x2)
Version E&C
Ring terminal (external) x1
Grounding nut x1
Ring terminal (internal) x1
Set screw(for mounting) x1
Gasket x1
Meter x1
Wifi module(optional) x1
Smart Plug(optional) x1
EPS connection steps:
1. Make wires(EPS cable size: refer to the table below)
12mm
60mm
I Version
12mm
L
N
PE
60mm
N-BAR
E-BAR
E Version
X1-Hybrid-3.0-D
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
Model
X1-Hybrid-3.0-N
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
EPS Cable
≥5mm²
≥5mm²
EPS breaker
25A
25A
table. Cable and Micro-breaker recommended
required for installation
2. Insert EPS cable into EPS port through screw cap.
L
N
PE
E-BAR
I Version
L
N
Note: The black cable( the N
Note: ConnectPEwire into
PE
port at right side) has
been wired during the
E-BAR
manufactory.
-Mark position of four holes.
-Drill holes with φ10 drill. Depth: at least 60mm.
-Tighten the expansion tubes. Screw the expansion screws.
375.0mm
- Screw the set screw on the left-bottom
of inverter tightly.
PVconnectionsteps
positive DC
pin contact
10 mm
nagetive DC
cable
pin contact
10 mm
AC connectionsteps(AC cable size:refer to table1&table2):
1.Remove thetop-down cover.
3.Insert AC cable into AC port
through screw cap.
X1-Hybrid-3.0-D
Model
X1-Hybrid-3.0-N
Cable
Micro-breaker
Battery connection diagram
ON
+
+
OFF
PV1
PV2
-
-
current of
Nonpolarized
breaker>32A
DC breaker
Power connection
high-voltage lithium battery
X1-Hybrid-5.0-D
X1-Hybrid-5.0-N
≥5mm²
≥5mm²
32A
32A
A:Power Connection Steps:
B:Communication Connection Steps:
E Version
N port at right !
Step1: Disassemble the BMS/Meter
cable gland.
Mounting Steps
-Match the inverter with the bracket.
- If necessary, costomer can install an
anti-theft lock on the left-bottom of the
inverter.
PV and AC Connection
:
(PV cable size:12AWG)
male plug
tight nut
clamp contact
nut
12mm
60mm
2. Make AC wires.
4. Connect the wire to the AC terminal in the inverter.
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
X1-Hybrid-5.0-D
Model
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
X1-Hybrid-5.0-N
Cable
4-5mm²
4-5mm²
5-6mm²
5-6mm²
20A
20A
32A
32A
Micro-breaker
table1. E Version & C Version
Battery Connection
Battery breaker
Before connecting to battey, please install a nonpolarized DC breaker to make
+
sure inverter can be securely disconnected during maintanance.
BAT
-
Model
Voltage
Current[A]
Communication connection
BMSPIN De nition
Communication interface bewteen inverter and battery is Rs485 orCAN with aRJ45
connector.
PIN
+
CAN/ RS485
Definition
-
CAN
Rs485
Definition
When using RS485 protocol, please note that PIN2 must be disconnected.
Note:
The battery communication can only work when the battery BMS iscompatible
withtheinverter.
Press down spring until it clicks audibly into place
wire strands
The ne wire strands must be seen in the champer
The seal is used for waterproof. Please
make sure it has been kept back.
Step2: Prepare a communication
Step3:Assemble the cable gland and
cable(without sheath)and insert
screw the cable nut.
the communication cable through
the cable nut.
-Overview of Mounting
-Align the halves connectors
female plug
Note: Iport has been wired
Note: No need to connect wire
during the manufactory.
on the X port by enduser!
I Version
E Version
a.L-wire,N-wire connection
b.PE wire connection
X1-Hybrid-3.0-D
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
X1-Hybrid-5.0-D
X1-Hybrid-3.0-N
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
X1-Hybrid-5.0-N
8-10mm²
8-10mm²
10-13mm²
10-13mm²
50A
63A
63A
50A
table2. I Version
X1-Hybrid-3.0-D
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
X1-Hybrid-5.0-D
X1-Hybrid-3.0-N
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
X1-Hybrid-5.0-N
Nominal voltage of DC breaker should be larger than maximum
voltage of battery.
32A
1
2
3
4
5
6
7
8
X
GND
X
BMS_CANH
BMS_CANL
X
X
X
X
X
X
X
X
GND
BMS_485A
BMS_485B
Step4:Insert one Rj45 side of the cable into
BMS port inside of inverter and the other
side into RS485 or Can port of the battery.
Need help?
Do you have a question about the X1-Hybrid-3.0-D and is the answer not in the manual?
Questions and answers