Download Print this page
SolaX Power X1-Hybrid Quick Installation Manual

SolaX Power X1-Hybrid Quick Installation Manual

Hide thumbs Also See for X1-Hybrid:

Advertisement

Quick Links

Quick Installation Guide
X1-Hybrid 3KW-5KW
Packing List
Inverter x1
Bracket x1
Battery connectors
(positive x1, negative x1)
Version I
DC pin connectors
(positive x2, negative x2)
AC terminal x8 *
User manual x1
Quick installation guide x1
Warranty card x1
AC terminal x8 *:
4 6AWG AC terminals and 4 10AWG AC terminals for Version I
4 10AWG AC terminals and 4 8AWG AC terminals for Version E and Version C
EPS Connection(for I version and E version )
I
EPS wiring diagram
I Version inverter:EPSfunctioncanbeonlybeachievedautomatically.
Do not required for Changeover Switch.
I Version
Auto
Do not required for Changeover Switch
wired by manufactor
I Version
required for installation
PV2+
PV1+
RCMB
PV2 -
PV1 -
+
Battery
-
L
I
I
L
EPS
AC
EPS breaker:
32A
RCD: type A
RCD
RCD
L
EPS Load
Load
E Version inverter:EPSfunctioncanbeachieved manually or automatically.
E Version
Manual
Required for Changeover Switch
E Version
wired by manufactor
PV2+
PV1+
RCMB
PV2 -
PV1 -
+
Battery
-
L
PE
L
EPS
AC
EPS breaker:
32A
changeover device( DPDT )
RCD
Load
RCD: type A
RCD
L
EPS Load
E Version
Auto
Required for Changeover Switch
E Version
wired by manufactor
PV2+
PV1+
required for installation
RCMB
PV2 -
PV1 -
+
Battery
-
L
PE
L
EPS
AC
EPS breaker:
32A
Contactor Device
Contactor
RCD
Load
RCD: type A
RCD
L
EPS Load
Please contact our sales for any compatible contactor purchase requirement .
DC connectors
Expansion tube x 4
(positive x2, negative x2)
Expansion screw x 4
Version E&C
Ring terminal (external) x1
Grounding nut x1
Ring terminal (internal) x2
Set screw(for mounting) x1
Gasket x1
8 pin positive
Wifi module(optional) x1
terminal x1
EPS connection steps:
1. Make wires(EPS cable size: refer to the table below)
12mm
60mm
I Version
12mm
L
N
PE
60mm
N-BAR
E-BAR
E Version
X1-Hybrid-3.0-D
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
Model
X1-Hybrid-3.0-N
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
EPS Cable
5mm
5mm
EPS breaker
25A
25A
table. Cable and Micro-breaker recommended
required for installation
2. Insert EPS cable into EPS port through screw cap.
L
N
PE
E-BAR
I Version
L
N
Note: The black cable( the I
Note: ConnectPEwire into
PE
port at right side) has
been wired during the
E-BAR
manufactory.
-Mark position of four holes.
-Drill holes with φ10 drill. Depth: at least 60mm.
-Install the expansiontubes,thentighten the expansion bolts.
375.0mm
- Screw the set screw on the left-bottom
of inverter tightly.
PVconnectionsteps
positive DC
pin contact
10 mm
negative DC
cable
pin contact
10 mm
AC connectionsteps(AC cable size:refer to table1&table2):
1.Remove thetop-down cover.
cable
3.Insert AC cable into AC port
connector x2
through screw cap.
X1-Hybrid-3.0-D
Model
X1-Hybrid-3.0-N
Cable
4-5mm
Micro-breaker
Battery connection diagram
ON
+
+
OFF
PV1
PV2
BAT
-
-
current of
Nonpolarized
breaker>32A
DC breaker
Power connection
high-voltage lithium battery
X1-Hybrid-5.0-D
X1-Hybrid-5.0-N
5mm
5mm
32A
32A
A:Power Connection Steps:
B:Communication Connection Steps:
Step1. Prepare a communication cable (without sheath) and insert
the communication cable through the cable connector which can
be found in the accessories package .
Step2. Crimp the communication cable with a Rj45 plug which is
inside of the cable connector.
E Version
Step1
cable connector
communication cable
PE port at right !
Rj45 plug
Mounting Steps
-Match the inverter with the bracket.
- If necessary, costomer can install an
anti-theft lock on the left-bottom of
the inverter.
PV and AC Connection
:
(PV cable size:12AWG)
( Wire crimper recommended model:
H4TC0001, manufacturer: Amphenol)
male plug
tight nut
clamp contact
nut
12mm
60mm
2. Make AC wires.
4. Connect the wire to the AC terminal in the inverter. 
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
X1-Hybrid-5.0-D
X1-Hybrid-3.0-D
Model
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
X1-Hybrid-5.0-N
X1-Hybrid-3.0-N
Cable
4-5mm
5-6mm
5-6mm
20A
20A
32A
32A
Micro-breaker
table1. E Version & C Version
Battery Connection
Battery breaker
Before connecting to battey, please install a nonpolarized DC breaker to make
+
sure inverter can be securely disconnected during maintanance.
-
Model
Voltage
Current[A]
Communication connection
BMS PIN De nition
Communication interface bewteen inverter and battery is Rs485 orCAN with aRJ45
connector.
PIN
1
+
CAN/ RS485
-
Definition
NTC
Note:
The battery communication can only work when the battery BMS iscompatible
withtheinverter.
Press down spring until it clicks audibly into place
wire strands
The ne wire strands must be seen in the champer
Step3. Insert the cable connector into BMS port inside of
inverter and screw it thightly. Then insert other side of
communication cable into RS485 or Can port of the battery.
Step3
Step2
-Overview of Mounting
-Align the halves connectors
female plug
Note: Iport has been wired
Note: No need to connect wire
during the manufactory.
on the X port by enduser!
I Version
E Version
a.L-wire,N-wire connection
b.PE wire connection
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
X1-Hybrid-5.0-D
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
X1-Hybrid-5.0-N
8-10mm
8-10mm
10-13mm
10-13mm
50A
63A
63A
50A
table2. I Version
X1-Hybrid-3.0-D
X1-Hybrid-3.7-D
X1-Hybrid-4.6-D
X1-Hybrid-5.0-D
X1-Hybrid-3.0-N
X1-Hybrid-3.7-N
X1-Hybrid-4.6-N
X1-Hybrid-5.0-N
Nominal voltage of DC breaker should be larger than maximum
voltage of battery.
32A
2
3
4
5
6
7
8
BMS_485A
BMS_485B
GND
GND
BMS_CANH
BMS_CANL
X
ON
+
+
+
OFF
C
PV1
PV2
BAT
-
-
-
B
I
BMS Port

Advertisement

loading
Need help?

Need help?

Do you have a question about the X1-Hybrid and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SolaX Power X1-Hybrid

  • Page 1 -Drill holes with φ10 drill. Depth: at least 60mm. -Install the expansiontubes,thentighten the expansion bolts. 375.0mm Quick Installation Guide X1-Hybrid 3KW-5KW -Overview of Mounting - If necessary, costomer can install an - Screw the set screw on the left-bottom anti-theft lock on the left-bottom of of inverter tightly.
  • Page 2 Earth Connection&Start Inverter Start Guide This function allows the inverter able to Earth Connection Steps(mandatory): 1.Set language 2.Set date time 3.Set the safety standard 4.Set export control control energy exported to the grid. There are user value and factory value. The Safety Export Control Export control...

This manual is also suitable for:

X1-hybrid-3.0-dX1-hybrid-3.0-nX1-hybrid-3.7-dX1-hybrid-3.7-nX1-hybrid-4.6-dX1-hybrid-4.6-n ... Show all