Download Print this page

Daikin EHBH04DA6V7 Installer's Reference Manual page 68

Hide thumbs Also See for EHBH04DA6V7:

Advertisement

7
|
Installation
7.2.3 To open the indoor unit
Installer reference guide
68
Overview
3
2
1
1
4
1
Front panel
2
Switch box cover
3
Switch box
4
User interface panel
Open
1 Remove the front panel.
2 If you have to connect electrical wiring, remove the switch box cover.
3 If you have to do work behind the switch box, open the switch box.
4
2
2
3
1
ERGA04~08DAV3(A) + EHBH/X04+08DA*V7
Daikin Altherma 3 R W
4P618958-1 – 2020.03

Advertisement

loading