4. Hold the Right Upright (90) against the Base
(94). Make sure not to pinch the Upright Wire
(81).
Next, Attach a 3/8" x 1 3/4" Screw (62) with a
3/8" Star Washer (13) as shown; do not fully
tighten the Screw yet.
Insert two 3/8" x 2 1/4" Screws (7) with two 3/8"
Star Washers (13) and a 3/8" x 1 1/4" Screw
(63) with a 3/8" Star Washer into the bracket
at the bottom of the Right Upright (90), and
partially tighten the three Screws into the Base
(94); do not fully tighten the Screws yet.
Attach the Left Upright (not shown) in the
same way. Note: There are no wires on the left
side.
5. Identify the Left and Right Base Covers (82, 83).
Slide the Left and Right Base Covers onto the
Left and Right Uprights (89, 90) as shown.
4
94
13
90
63
5
89
82
10
7
13
81
62
13
90
83
Need help?
Do you have a question about the PERFORMANCE 400i and is the answer not in the manual?
Questions and answers