Installation Procedure - Toto GB TBG10306U Installation And Owner's Manual

Freestanding tub filler
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION PROCEDURE

Cutting the Plaster Guard
1. Cut the plaster guard at a height of
3/8"(10mm)
3/8" (10mm) from the finished floor surface
8mm
and remove the plug, the bolt and the
blocking lid from the tub filler base.
(a) If the finished floor exceeds the max
line, the escutcheon of the spout body,
etc. cannot be mounted properly, there-
fore, make arrangements beforehand
about the floor finishing.
Mounting the Faucet Main Body
2. In order to prevent reversed piping,
pay attention to the direction of the
spout main body when mounting the
spout main body onto the tub filler base.
3. Adjust the direction of the spout in relation to the
bathtub and secure the spout main body using the
provided bolts. Confirm that the spout main body is
vertical. Check the spout main body for looseness
and make sure that water does not pass through
the product or leak from the connections when the
handle is closed.
8mm
4

Advertisement

Table of Contents
loading

Table of Contents