A wall mounted high efficiency condensing gledhill boiler (41 pages)
Summary of Contents for Benchmark VOKERA Mynute 12 VHE
Page 1
Mynute 15VHE G.C. N° 41 094 68 THESE INSTRUCTIONS TO BE RETAINED BY USER Vokèra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK.
10.7 Combustion analysis test 3A.8 Mounting on a combustible surface 10.8 Appliance fan speeds 3A.9 Timber framed buildings 3A.10 Inhibitors Commissioning checklist 3A.11 Appliance pipework configuration 3A.12 Declaration of conformity Benchmark 40-41 Installation Page Delivery Contents Unpacking Preparation for mounting the appliance Fitting the flue Connecting the gas &...
Page 3
Vokera customer services. zontally – through 360 degrees for various horizontal or All installers are asked to follow the Benchmark Scheme vertical applications; in addition, there is also a facility to by adhering to the Code of Practise, which can be obtai- re-configure the flue outlet from a top outlet to rear outlet.
Page 4
2-digit LED TEMPERATURE SELECTOR GREEN LED RED LED display MODE SELECTOR SWITCH Fig. Boiler at reset/standby Select this position if/when the boiler requires to be reset Boiler switched OFF Select this position if you want the boiler to remain OFF (this will over-ride any heating/hot water request from the time-clock/programmer) Boiler switched ON Select this position when you want the boiler to respond to a heating/hot water...
Page 7
Fig. 3 Location Minimum distance Below an opening (window, air-brick, etc.) 300 mm Above an opening (window, air-brick, etc.) 300 mm To the side of an opening (window, air-brick, etc.) 300 mm Below gutter, drain-pipe, etc. 25 mm Below eaves 25 mm Below balcony, car-port roof, etc.
SECTION 3 GENERAL REQUIREMENTS (UK) This appliance must be installed by a competent person with BS 6891. in accordance with the Gas Safety (Installation & Use) Pipe work from the meter to the appliance must be of Regulations. adequate size. Pipes of a smaller size than the appliance gas inlet connection must not be used.
3.6.2 AUTOMATIC BY-PASS NOTE Vokera recommend that an automatic bypass is installed The combined feed and vent pipe must rise continu- ● to ensure the required minimum flow-rate is achieved at ously and be unrestricted. all times. Additionally, the design of the system and its The diameter of the combined feed and vent pipe shall ●...
Page 10
3.11.2 ALTERNATIVE CLOSE-COUPLED AR- RANGEMENT If necessary or if preferred, a close-coupled arrange- ment for the feed and expansion pipe work can be used as an alternative to a combined feed and vent pipe. The configuration of the close-coupled pipe work shall be as shown in figure 4B.
SECTION 3A GENERAL REQUIREMENTS (EIRE) This appliance must be installed by a competent person in metres (or less) below plastic guttering or 1 metre (or less) below painted eaves. accordance with and defined by, the Standard Specifica- tion (Domestic Gas Installations) Declaration (I.S. 813). 3A.5 AIR SUPPLY The following notes are intended for general guidance only.
NOTE Building Regulations. The Institute of Gas Engineers publication (IGE/UP/7) The distance between the cold feed pipe and the safety ● ‘Guide for Gas Installations in Timber Frame Buildings’ vent pipe shall be no more than 150mm gives specific advice on this type of installation. The cold feed pipe must be inverted as shown in fig.
SECTION 4 INSTALLATION 4.1 DELIVERY NOTE Although the weight of the appliance is 25kg, depending These instructions relate only to the Vokera condensing on site conditions, it may be necessary for two people to 60/100mm concentric flue system. For specific details on lift and attach the appliance to its mounting.
Page 14
4.5.1.1 EXTENDING THE FLUE FITTING THE HORIZONTAL FLUE KIT Connect the bend – supplied with the terminal kit – to Carefully measure the distance from the centre of the the top of the boiler using clamp (supplied) see fig. 7. appliance flue outlet to the edge of the finished outside The additional bends &...
Page 15
Vertical flue terminal and accessories Part No. Description Min-Max length Vertical flue terminal 1000 mm Pitched roof flashing plate Flat roof flashing plate 90-degree bend 45-degree bends (pair) 500mm extension 500mm 1000mm extension 1000 mm 2000mm extension 2000 mm Telescopic extension 350/730mm Wall bracket pack (5) 208mm...
Page 16
4.5.3 TWIN FLUE SYSTEM and secure the exhaust manifold connection to the flue The Vokera twin flue system enables greater flue distances spigot using the screw provided (C). to be achieved (see 4.4.2) than that of a concentric flue • Using the two holes in the air inlet plate as a guide, drill system.
NOTE Seal the flue terminal assembly to the wall using cement or a suitable alternative that will provide satisfactory weatherproofing. The interior and exterior trim can now be fitted. 4.5.3.3 VERTICAL TERMINATION (fig. 16) The twin flue system must be converted to the dedicated concentric flue kit for termination.
top connections capped off, however these can be re- moved to allow pipe work configurations as detailed in 3.11. Depending on system requirements, it may necessary to increase the size of the flow & return pipe work after the service connections. 4.6.3 CONDENSE PIPE During normal operation the boiler produces condense which is collected in a trap located in the lower part of...
Page 19
4.7.3 CONNECTING THE MAINS (230V) INPUT (see fig. 21) Locate and remove the terminal block cover (230V) pressing clip (A). Pass the supply cable first through the cable anchorage point and then through cable glands. Connect the supply cable wires (LIVE, NEUTRAL, & EARTH) to their corresponding terminals (L, N, &...
SECTION 5 COMMISSIONING 5.1 GAS SUPPLY INSTALLATION 5.5 PRE-OPERATION CHECKS Before attempting the initial lighting of the appliance, the Inspect the entire installation including the gas meter, following checks must be carried out: test for tightness and purge. Refer to BS 6891 (I.S. 813 •...
Complete details of the boiler, controls, installation and commissioning in the Benchmark checklist at the back of this book. It is important that the Benchmark checklist is correctly completed and handed to the user. Failure to install and commission the appliance to the manufactu- rers instructions will invalidate the warranty.
Service Record must be completed. ALWAYS TEST FOR GAS TIGHT NESS IF ANY GAS For UK only: It is important that the Benchmark Service CARRYING COMPONENTS HAVE BEEN REMOVED Record is correctly completed and handed to the user.
6.8 PRINTED CIRCUIT BOARD (fig. 25) Replace in the reverse order. Check and adjust burner Carry out component removal procedure as described in pressure settings. 6.4. Pull the control fascia forward and lower it. Locate WARNING, A GAS TIGHTNESS CHECK MUST BE and remove the screws which secure the control panel CARRIED OUT.
6.12 FLUE FAN & BURNER ASSEMBLY Step 1 Carry out component removal procedure as described in 6.4. Step 2 Slacken the gas pipe (A) at the outlet connection and swing/rotate away from the fan assembly. Disconnect the electrical plugs from the fan. If only the fan/fan mixer is to be removed, proceed to step 6.
6.14 CONDENSE TRAP REMOVAL (fig. 32) 6.13 MAIN HEAT EXCHANGER (fig.31) The heat exchanger is a non-serviceable item and should Carry out component removal procedure as described only be removed if it’s necessary to replace it. The heat in 6.4. Disconnect the 2 upper rubber condense pipes. exchanger and flue fan assembly can be removed as a Remove the pin (A) that secures the trap to the air box single assembly from the appliance, or alternatively, the...
SECTION 7 CHECKS, ADJUSTMENTS AND FAULT FINDING 7.1 CHECKING APPLIANCE OPERATION • ANTI-CYCLE FUNCTION: The anti-cycle function When carrying out any repairs or servicing to the ap- ensures the burner remains switched off for at least pliance, the relevant commissioning procedure must be 5-minutes after the set-point hysterisis (set-point + 2 undertaken to ensure the continued safe operation of the -8 °C).
or adjusted prior to making any adjustments to the gas 7.4 CORRECTING THE CO VALUES/ADJUSTING valve or if the main PCB has been replaced. THE GAS VALVE THE GAS VALVE MUST BE SET-UP OR ADJUSTED ATTENTION WITH THE AID OF A PROPERLY CALIBRATED FLUE Gas type and appliance fan speed (output) must be set GAS ANALYSER.
pressure must be adjusted as follows: 7.7 ELECTRICAL CHECKS • Using a 2,5mm Allen key, very slowly turn the minimum Any electrical checks must be carried out by a suitably adjustment screw (see fig. 36) – clockwise to increase, qualified person. counter clockwise to decrease - until the correct value is displayed on the CO analyser (allow time for the...
NOTE Restore the electrical supply to the boiler and turn the selector switch to the on position. The boiler should now function as described in section 7.2. Should the boiler fail to respond, the internal fuses and connectors should be checked to ensure integrity and continuity.
SECTION 8 WIRING DIAGRAMS 8.1 EXTERNAL WIRING The appliance comes with a factory fitted (TA) link to allow basic operation of the boiler via the mode selector switch. If external controls are to be added to the system, they must be connected to the appliance as shown in the following diagrams.
Page 31
FUNCTIONAL DIAGRAM NOTE. L-N-E CONNECTION MUST NOT BE INTERCHANGED CONTROL SWITCHING OF TIME CLOCK AND ROOM THERMOSTAT RATED IS 230 V.a.c. Fig. 39 F Hv Fan power supply 230 V X4÷X9 Connection to PCB low voltage F Lv Fan signal control F.O.H.T Flow over heat thermostat E.P.
Page 32
FUNCTIONAL DIAGRAM Fig. 40 8.4.1. “S” - Plan with Vokera 2-channel programmer 8.4.2. “Y” - Plan with Vokera 2-channel programmer Fig. 41...
SECTION 10 LPG INSTRUCTIONS 10.1 RELATED DOCUMENTS BS 6798 INSTALLATION OF BOILERS OF RATED INPUT NOT EXCEEDING 60 kW BS 5449 PART 1 FORCED CIRCULATION HOT WATER SYSTEMS BS 5446 INSTALLATION OF GAS HOT WATER SUPPLIES FOR DOMESTIC PURPOSES BS 5440 PART 1 FLUES BS 5482...
10.6.2 GAS VALVE MINIMUM SETTING 10.8.2 ABSOLUTE MAX FAN SPEED Locate and gently turn the HTG trimmer till the minimum Locate the MAX trimmer (fig. 43) and gently adjust clock- value (fan speed) is obtained and check that it corre- wise or counter clockwise to achieve the correct fan speed sponds with the appropriate CO value (Minimum) for...
Boiler is opera ng sa sfactorily No further ac ons required. Ensure test points are capped, boiler case is correctly replaced and all other commissioning procedures are completed. Complete Benchmark Checklist, recording CO and combus on ra o readings as required.
To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas Safe registered engineer who has been trained on the boiler installed. The service details should be recorded on the Benchmark Service Interval Record and left with the householder.
Page 42
Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This does not affect the customer’s statutory rights.
Page 43
SERVICE RECORD It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. Always use the manufacturer’s specified spare part when replacing controls.
Page 44
Registered address: Vokèra Ltd Borderlake House Unit 7 Riverside Industrial Estate London Colney Herts AL2 1HG enquiries@vokera.co.uk www.vokera.co.uk www.vokera.ie Sales, General Enquires T 0844 391 0999 F 0844 391 0998 Vokèra Ireland West Court, Callan Co Kilkenny T 056 7755057 F 056 7755060 Vokèra Limited reserve the right to change specifi...
Need help?
Do you have a question about the VOKERA Mynute 12 VHE and is the answer not in the manual?
Questions and answers